Oberizon Construction
Reception desk and arched display millwork in a completed medical clinic

Oberizon Construction

Healthcare Construction Contractor

Dental, medical, pharmacy, physiotherapy, chiropractic, optometry and veterinary clinics each have a page. All of them answer to CSA Z8000 and IPAC barriers.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

The short answer

What does it cost?

Infection control zoning and each room's services are planned first. Dental, medical, pharmacy, physiotherapy, chiropractic, optometry, veterinary and clinic renovation each have a page.

2026 range

$375,000 – $800,000

$150–$320 per sq ft turnkey — typically $375k–$800k for a 2,500 sq ft space.

That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.

Estimate your build

What's included

Scope of the work.

Healthcare projects managed around compliance, equipment, service locations, patient flow, and operational readiness.

  • Clinical layout and service coordination
  • Equipment, millwork, plumbing, and electrical planning
  • Inspection, deficiency, and handover management

Each clinic type has its own page.

Healthcare construction covers the clinic types below. Dental stays. It is no longer the only one.

Medical clinic construction. Physiotherapy. Chiropractic. Optometry. Veterinary. Clinic renovation. Physiotherapy clinic construction is its own page.

  • Medical

    Family and specialist clinics. Exam rooms, intake and staff circulation.

  • Dental

    Operatories, sterilization, vacuum and compressed air.

  • Pharmacy

    Dispensary sightlines, security and compounding rooms.

  • Physiotherapy

    Treatment rooms, an open rehab floor and acoustics.

  • Chiropractic

    Private treatment rooms and a multi-practitioner reception.

  • Optometry

    Refraction lanes and an optical dispensary.

  • Veterinary

    Washdown finishes, kennel acoustics and species-separated waiting.

  • Clinic renovation

    A practice that stays open while one zone is rebuilt.

What a healthcare construction contractor holds.

A healthcare construction contractor holds the prime contract. Permits, trades, inspections and the deficiency list sit with one team. The office is Suite 305, 1493 Foster Street, White Rock, BC V4B 0C4. Hours are Monday to Friday, 9:00 AM to 6:00 PM. The phone is (604) 385-3770.

  • Clinical rules

    Drawings are prepared with CSA Z8000 in mind. Infection-control barriers follow IPAC practice when a clinic stays open. CSA Z317.13 applies during construction in an occupied clinic.

  • Who permits it

    The municipality issues the building permit. Fraser Health is the health authority south of the North Shore. Vancouver Coastal Health covers the North Shore. Vancouver uses the Vancouver Building By-law.

  • Published cost

    Healthcare construction is published at $150–$320 per sq ft. Medical clinic construction is $150–$260. Dental clinic construction is $300–$450. None of those is a city price.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Skinholic Aesthetics, Abbotsford, BC
Med spaDelivered

Skinholic Aesthetics

Abbotsford, BC

Specialty
Med spa
City permit authority
City of Abbotsford — Planning and Development Services
  • Med spa interior in Abbotsford
  • Planning, building permit, millwork, plumbing, electrical and mechanical
  • Interior design, carried out as per the drawings
  • Contract dated 25 July 2025. The job is closed
Read the case study
PharmacyIn progress

156 St pharmacy

156 Street, Surrey, BC

Specialty
Pharmacy
Size
1,500 sq ft
City permit authority
City of Surrey — Building Division
  • 1,500 sq ft pharmacy tenant improvement
  • Planning, building permit, millwork, plumbing, electrical and mechanical
  • Flooring, lighting and washrooms
  • In progress on 156 Street

Case studies

Guides

What we have written about this.

Cost, timeline and permit detail for healthcare construction, with the numbers left in.

All construction guides

Questions

Frequently asked.

What is healthcare construction?

Build-outs for clinical spaces governed by CSA Z8000 and IPAC infection-control barriers, not standard commercial code alone. Oberizon Construction builds dental, medical, pharmacy, physiotherapy, chiropractic, optometry and veterinary clinics from White Rock.

What should a healthcare operator look for when hiring a contractor for a clinic build-out?

Oberizon Construction is a White Rock, BC general contractor. Ask for clinics you can visit, a written per-square-foot range and the name of the person who runs the site. Confirm the health authority and the building permit path before you sign a lease. The office is Suite 305, 1493 Foster Street, and the phone is (604) 385-3770.

How much does healthcare construction cost?

$150–$320 per sq ft turnkey — typically $375k–$800k for a 2,500 sq ft space. Base-building condition and finish level move that number most.

Where does Oberizon deliver healthcare construction?

Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.

What should I have ready before starting?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Book a Consultation

Planning healthcare construction? Tell us the space.

Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.

WhatsAppCall