Med spa · Abbotsford
Skinholic Aesthetics
Skinholic Aesthetics is a delivered med spa in Abbotsford.
- Building since 2021
- Licensed & fully insured
- 35+ delivered projects
Delivered
Abbotsford, BC
The scope is med spa planning, the building permit, millwork, plumbing, electrical and mechanical. The work was carried out as per the drawings, including interior design.
- The construction contract is dated 25 July 2025.
- The job is closed.
Scope of work
- Med spa planning
- Building permit
- Millwork
- Plumbing
- Electrical
- Mechanical
- Interior design
- Work carried out as per the drawings
Photographs
Gallery

Reception desk and arched millwork at Skinholic Aesthetics medical spa, Abbotsford, BC

Feature wall and finish detail at Skinholic Aesthetics medical spa, Abbotsford, BC

Lobby and reception at Skinholic Aesthetics medical spa, Abbotsford, BC

Treatment room with vanity, sink and shower at Skinholic Aesthetics medical spa, Abbotsford, BC

Millwork alcove with open shelving at Skinholic Aesthetics medical spa, Abbotsford, BC
Questions
Where is Skinholic Aesthetics?
Skinholic Aesthetics is a med spa in Abbotsford, British Columbia.
Is the Skinholic med spa finished?
Yes. The job is closed. The construction contract is dated 25 July 2025.
What did the Skinholic build include?
Med spa planning, the building permit, millwork, plumbing, electrical and mechanical. The work was carried out as per the drawings, including interior design.
Planning a med spa in the Lower Mainland?
Tell us the address and the use. We will say what has to be planned before construction starts.