Oberizon Construction
Completed luxury home exterior at the West Cordova residential build, Vancouver, BC

Oberizon Construction

Luxury Home Builder

A custom home is a finish schedule with a house attached to it.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

The short answer

What does it cost?

Millwork and imported fixtures set the critical path. They are ordered against the framing schedule, not after it.

2026 range

$1,350,000 – $1,800,000

$300–$400 per sq ft turnkey — typically $1.4M–$1.8M for a 4,500 sq ft space.

That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.

Estimate your build

What's included

Scope of the work.

Luxury residential projects controlled through planning, sequencing, finish standards, and clear owner communication.

  • Custom home planning and construction management
  • Finish, millwork, fixture, and detail coordination
  • Quality control through final walkthrough and handover

The work

Builds we have delivered.

West Cordova residential build, West Cordova, Vancouver, BC
Luxury residentialDelivered

West Cordova residential build

West Cordova, Vancouver, BC

Specialty
Luxury residential
City permit authority
City of Vancouver — Development and Building Services Centre
The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Questions

Frequently asked.

How long does a custom home take?

Ten to fourteen months of construction for a 4,500 sq ft home, after design and permits. Long-lead millwork drives the critical path.

How much does luxury residential construction cost?

$300–$400 per sq ft turnkey — typically $1.4M–$1.8M for a 4,500 sq ft space. Base-building condition and finish level move that number most.

Where does Oberizon deliver luxury residential construction?

Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.

What should I have ready before starting?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Book a Consultation

Planning luxury residential construction? Tell us the space.

Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.

WhatsAppCall