Oberizon Construction
Dental operatory with chair, overhead light and service cabinetry

Oberizon Construction

Pharmacy Construction

A pharmacy is a security and compounding problem wrapped inside a retail fit-out.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

The short answer

What does it cost?

Dispensary sightlines and security glazing come first. USP 795/797 compounding rooms need pressure cascades designed in, not added.

2026 range

$270,000 – $375,000

$180–$250 per sq ft turnkey — typically $270k–$375k for a 1,500 sq ft space.

That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.

Estimate your build

What's included

Scope of the work.

Pharmacy construction planned around customer experience, dispensing workflow, storage, security, and inspection timing.

  • Retail, dispensing, storage, and staff-area planning
  • Millwork, services, accessibility, and security coordination
  • Construction sequence and launch handover

Pharmacy renovation and new fit-outs.

Pharmacy construction covers a new dispensary and a pharmacy renovation. Security glazing, the consultation room and the College layout rules are the same scope either way. Vancouver has its own city page.

Pharmacy construction in Vancouver. Pharmacy construction in Surrey. The layout rules are in the pharmacy layout guide and the cost is in the pharmacy build-out cost guide.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Questions

Frequently asked.

What makes a pharmacy build different?

Security glazing and dispensary sightlines are designed in from the start. Compounding rooms need USP 795/797 pressure cascades, which cannot be retrofitted cheaply.

How much does pharmacy construction cost?

$180–$250 per sq ft turnkey — typically $270k–$375k for a 1,500 sq ft space. Base-building condition and finish level move that number most.

Where does Oberizon deliver pharmacy construction?

Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.

What should I have ready before starting?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Book a Consultation

Planning pharmacy construction? Tell us the space.

Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.

WhatsAppCall