Oberizon Construction
Reception and waiting area at The Shine Dental, White Rock, BC

Oberizon Construction

Dental Clinic Construction

A new dental clinic is suction lines and plumbing long before it is finishes. A practice that is already open is a renovation, and that work is a different page.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

The short answer

What does it cost?

Chair positions fix the plumbing. Move a chair after the slab is poured and you are cutting concrete, not adjusting a drawing.

2026 range

$750,000 – $1,125,000

$300–$450 per sq ft turnkey — typically $750k–$1.1M for a 2,500 sq ft space.

That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.

Estimate your build

What's included

Scope of the work.

Dental clinic builds coordinated around operatories, sterilization, plumbing, electrical, cabinetry, and patient flow.

  • Operatory and sterilization coordination
  • Dental plumbing, electrical, equipment, and millwork planning
  • Inspection readiness and clean handover

Dental office construction.

This page is a new dental clinic. Operatories, sterilization, vacuum and compressed air are set before the floor is closed. The published band is $300–$450 per sq ft. It is not a city price. A practice that already sees patients is not this page.

A live practice is a dental clinic renovation. Firms are compared on dental office construction companies. A leased medical shell is a medical clinic fit-out. A rehab floor is physiotherapy clinic construction.

Dental clinic construction in Vancouver. Dental clinic construction in Surrey. Dental clinic construction in Chilliwack. Dental clinic construction in Coquitlam. Dental office build-out.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Case studies

  • Dentists in Aldergrove

    Completed dental clinic at Unit 115, Aldergrove, in the Township of Langley. Finished June 2026.

  • The Shine Dental, White Rock

    Delivered dental clinic in White Rock, on the South Surrey peninsula. Five operatories in 90 days.

  • Flamingo Dental Clinic

    1,158 sq ft dental fit-out in Whalley, Surrey. Three operatories and one future operatory. In progress.

Guides

What we have written about this.

Cost, timeline and permit detail for dental clinic construction, with the numbers left in.

All construction guides

Related for a new clinic.

One contract for design and construction is the dental clinic design-build page. The sequence from the site to opening day is how to open a dental office in BC.

Questions

Frequently asked.

How long does it take to build a dental clinic?

Typically 90 to 120 days from permit to handover for a standard operatory fit-out. Our fastest delivered clinic with five operatories took exactly 90 days.

What does a dental office build-out include?

Suction and compressed air at every operatory, plumbing set to fixed chair positions and heavier electrical for imaging. HVAC follows CSA Z8000 and finishes come last.

Is a dental build the same as a dental office renovation?

No, and the difference is where the services start. A dental build sets suction, water, drainage and imaging power into a shell with nothing in it, so chair positions are fixed on paper and poured into the slab. A renovation works around services that already exist. If you are taking a bare or stripped unit, this is the page; if you are updating a clinic that is already running, the renovation page is.

How much does dental clinic construction cost?

$300–$450 per sq ft turnkey — typically $750k–$1.1M for a 2,500 sq ft space. Base-building condition and finish level move that number most.

Where does Oberizon deliver dental clinic construction?

Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.

What should I have ready before starting?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Book a Consultation

Planning dental clinic construction? Tell us the space.

Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.

WhatsAppCall