Dental Office Construction Companies

Dental office construction companies should be compared on clinics you can name, a written cost band and the permit path. This page is that comparison method. The build itself is dental clinic construction.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

What to ask before you shortlist

Ask any firm for three things. A clinic with a street address you can check. A written per-square-foot range rather than a sentence that says it depends. The name of the person who will run the site from the building permit to handover.

Also ask who issues the permit. In the Lower Mainland that is the municipality. Vancouver uses the Vancouver Building By-law. The BC College of Oral Health Professionals registers the dentist. The college does not issue the building permit. Drawings for a dental clinic are prepared with CSA Z8000 in mind.

What Oberizon publishes

Oberizon Construction is a BC-licensed general contractor in White Rock. The office is Suite 305, 1493 Foster Street, White Rock, BC V4B 0C4. The phone is (604) 385-3770. Hours are Monday to Friday, 9:00 AM to 6:00 PM. The firm was founded in 2021.

Dental clinic construction is published at $300–$450 per square foot. It is a Lower Mainland band. It is not a price for one city. A live practice is a dental clinic renovation. One contract for design and construction is a dental office build-out.

Clinics on this site

The Shine Dental in White Rock is delivered. It is 2,500 sq ft with five operatories. The clinic was operational at handover, 90 days end to end.

Flamingo Dental Clinic is in progress at Unit 111, 10767 Whalley Boulevard, Surrey. It is 1,158 sq ft. The program is three operatories plus one future operatory roughed in at a consult room.

Dentists in Aldergrove at Unit 115 was completed in June 2026. The build includes frosted-glass operatories, a CBCT and X-ray room, sterilization and a reception. Two further dental clinics are in progress at #B115 and #E100, 8100 272 Street in Langley. The Marshall Road dental clinic at 104-33069 Marshall Road in Abbotsford is delivered and photographed.

City pages stay separate so a Vancouver search does not land on a Surrey clinic. Start with dental clinic construction in Vancouver or dental clinic construction in Surrey.

Questions

Frequently asked.

What should I ask dental office construction companies?

Ask for clinics with a street address, a written per-square-foot band and the name of the person who runs the site. Oberizon publishes dental clinic construction at $300–$450 per square foot. The municipality issues the building permit.

Where is Oberizon Construction based?

Suite 305, 1493 Foster Street, White Rock, BC V4B 0C4. The phone is (604) 385-3770. Hours are Monday to Friday, 9:00 AM to 6:00 PM. The firm was founded in 2021.

Which dental clinics can Oberizon name?

The Shine Dental in White Rock is delivered. It is 2,500 sq ft with five operatories and was operational in 90 days. Flamingo Dental Clinic in Surrey is 1,158 sq ft and in progress. Dentists in Aldergrove was completed in June 2026.

Planning a dental clinic?

Bring the address and the chair count. We will say what has to be planned before construction starts.