Design-build
Dental Clinic Design-Build in BC
One contract covers the design and the construction of a dental clinic in the Lower Mainland. We read the lease before you sign. Chair positions are fixed before rough-in.
- Building since 2021
- Licensed & fully insured
- 35+ delivered projects
One contract for design and construction
Design-build means one company is responsible for the drawings and for the build. You do not hire a designer and then tender the set. The builder should not be seeing the suite for the first time after the drawings are sealed.
The chair count is decided while it is still a drawing. So is the sterilization route. So is the imaging room. A change after rough-in means cutting concrete. A change before rough-in is a revision.
This page is the contract model. The trade scope is on dental clinic construction. The shell is not the same in every city. Those differences stay on the city pages rather than being copied here.
Lease review before you sign
The lease decides whether the clinic fits. A long narrow unit can need more area than a squarer suite for the same number of chairs. A podium under apartments can measure well and still fail once a compressor and a reception queue are drawn.
Three items belong in the review before a signature. The owner has to allow the work. The allowance has to be read against the real scope. You have to know what you cannot remove at the end of the term.
Strata hours belong in that same review. So does any coring of a common slab. Found later they become change orders. The step-by-step for a new practice is how to open a dental office in BC.
Chair layout before rough-in
Each chair needs vacuum, compressed air and a dedicated drain. The lines run in the slab or under the floor. The positions are locked before rough-in. Moving a chair later is concrete work.
Size the compressor and the vacuum pump for the final chair count. Opening day is the wrong number. A clinic plumbed for four chairs cannot take a sixth without new trunk lines.
Sterilization and x-ray shielding
Sterilization is a one-way route from dirty to clean. It is drawn before millwork is ordered. Instruments do not travel back through the clean side.
X-ray shielding is drawn before the walls close. Shielding added after drywall means opening that wall. The drawing set is prepared with CSA Z8000 expectations in mind. The clinical layout and the building permit should be one package.
The building permit and the college
The municipality issues the building permit. The BC College of Oral Health Professionals registers the dentist. The college does not review the construction drawings. A registration is not a permit. A permit is not a registration.
Vancouver uses the Vancouver Building By-law. Its office Tenant Improvement Program does not cover a dental fit-out. Every other city we work in publishes its own route. Those routes are written on the city pages.
Clinics we can show you
Two delivered dental clinics are photographed on this site. The Shine Dental is in White Rock. The Marshall Road clinic is at 104-33069 Marshall Road in Abbotsford. Two more clinics are in progress at #B115 and #E100, 8100 272 Street in Langley.
The only Vancouver project on the record is a house on West Cordova. It shows downtown access. It is not a dental clinic. We do not assign any other clinic to a city that is not on its record.
Time and cost
Design is often 6–12 weeks. Permits are often 6–16 weeks. Construction for a typical clinic is about 10–16 weeks after permits. These are Lower Mainland ranges. They are not a date for one address.
Dental clinic construction is published at $300–$450 per square foot. The band covers the Lower Mainland. It is not a city price. Operatory count and the condition of the base building move a job inside the band. The phases are in the dental clinic build timeline. The band is unpacked in dental clinic construction cost in BC.
Where the shell changes
Vancouver covers street-front units and downtown podiums under the Vancouver Building By-law.
Burnaby follows Metrotown, Brentwood and Lougheed. Most new suites there sit under occupied apartments.
Richmond splits No. 3 Road medical floors from older Steveston units. Commercial files go through MyPermit.
Coquitlam puts Town Centre podiums next to older Austin Heights and Maillardville units.
North Vancouver splits the City on Lonsdale from the District in Edgemont and Lynn Valley.
Questions
Frequently asked.
What does dental clinic design-build cost in the Lower Mainland?
The published band is $300–$450 per square foot. It covers the Lower Mainland. It is not a price for one city. Operatory count and the base building move a job inside the band.
How long does a dental clinic design-build take?
Design is often 6–12 weeks. Permits are often 6–16 weeks. Construction for a typical clinic is about 10–16 weeks after permits. These are Lower Mainland ranges. A single suite can sit outside them.
Who issues the building permit for a dental clinic?
The municipality issues the building permit. The BC College of Oral Health Professionals registers the dentist. The college does not review the construction drawings. A registration is not a building permit.
What has to be drawn before the walls close?
Chair positions. Each chair needs vacuum, compressed air and a dedicated drain. X-ray shielding is drawn before the walls close. The drawing set is prepared with CSA Z8000 expectations in mind.
Planning a dental clinic?
Bring the address and the lease stage. Tell us the chair count you expect at full capacity. We will say what has to be planned before construction starts.