
Private office build
White Rock, BC
- Specialty
- Commercial office
- City permit authority
- City of White Rock Building Division
- Commercial office fit-out in White Rock
Services
Healthcare
Healthcare ConstructionDental Clinic ConstructionDental Office RenovationMedical Clinic ConstructionPharmacy ConstructionPhysiotherapy Clinic ConstructionChiropractic Clinic ConstructionOptometry Clinic ConstructionVeterinary Clinic ConstructionClinic Renovation ContractorDental clinic design-buildMedical clinic interior designDental millwork and cabinetryDental equipment and plumbingX-ray room shieldingOperatory plumbing and vacuumDental clinic permits in BCBuying or starting a practiceDental office floor plansClinic Launch IncentivesCommercial
Commercial ConstructionCommercial RenovationOffice Renovation ContractorTenant Improvement Contractor
Oberizon Construction
A commercial build is won or lost on the permit sequence, long before anyone breaks ground.
The short answer
A commercial construction contractor earns the fee before site work starts. Base-building services rarely match what the drawings assume, so we verify electrical capacity and make-up air before pricing rather than after.
2026 range
$300,000 – $550,000
$120–$220 per sq ft turnkey — typically $300k–$550k for a 2,500 sq ft space.
That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.
Estimate your buildWhat's included
Commercial spaces built around operations, access, finish quality, inspections, and business continuity.
Oberizon works as a commercial general contractor on new build-outs and full fit-outs, from a single retail unit to a multi-suite floor. One team holds the scope, the budget and the schedule, so there is no gap between who priced the job and who runs it. That is the difference between a commercial builder and a broker with a list of subtrades.
We hold the prime contract, carry the trades and answer for the deficiency list. Nothing is subcontracted out of our control.
Ask any shortlist for their base-building verification, not their gallery. Electrical capacity and make-up air decide a fit-out price, and most quotes assume rather than check.
Scope, budget, schedule and inspections sit with us. The owner signs one agreement rather than coordinating eight.
Restaurant and retail work is a services problem wearing a finishes costume. Grease interceptors, make-up air, exhaust routing and grease-duct fire separation decide both the budget and the permit route, and none of them are visible in a mood board. We price those first and the finishes second.
Exhaust, make-up air and interceptor requirements are confirmed with the municipality and the health authority before a layout is priced.
Storefront glazing, exiting and accessible routes drive the shell work. Fixtures and finishes follow the base-building condition.
Retail becoming food service is a new occupancy classification. It triggers exiting, ventilation and washroom requirements the previous tenant never had to meet.
The work

White Rock, BC

White Rock, BC
90 days end to end. Five operatories.

Unit 115, Aldergrove, BC
Completed June 2026.
Where we build it
Oberizon is a general contractor serving British Columbia from a White Rock head office, working across fourteen cities from the Semiahmoo Peninsula out to Chilliwack. Pick your city for the local permit route, pricing and the projects nearest you.
Guides
Cost, timeline and permit detail for commercial construction, with the numbers left in.
Choosing a Contractor
BC Builders Lien Act for owners: the 10% holdback (s.4), holdback account (s.5), 45-day lien deadline (s.20), 55-day release (s.8) and the steps to take.
9 min read
Choosing a Contractor
CCDC 2 stipulated price, CCDC 3 cost plus and CCDC 5A/5B construction management compared: who carries cost risk, how you pay, and which fits your project.
8 min read
Cost
What a commercial construction estimate is actually made of — hard and soft cost, cash allowances, contingency, and the difference between a change order and a directive.
10 min read
Permits & Compliance
What changes when a commercial build moves east to Abbotsford or Chilliwack: two different tenant improvement permit routes, a published review window, and what actually costs less out here.
8 min read
Choosing a Contractor
Design-build against design-bid-build for a clinic or commercial fit-out — who carries the coordination risk in each, what changes about the price you are quoted, and how to choose.
10 min read
Leases & Planning
How to decide between renovating an existing commercial space and building new, on cost, timeline and risk.
8 min read
Where to go next
Questions
Budget 6 to 16 weeks for permits, then 10 to 16 weeks on site for a 2,500 sq ft fit-out. Permit time varies more than construction time.
Our office is on Foster Street in White Rock and we work across fourteen Lower Mainland cities, from the Semiahmoo Peninsula to Chilliwack. Everything is run from that office rather than handed to a local sub, so the site supervisor on your job is the one you met. If your address is outside that area we will say so rather than take the drive.
We work across the Lower Mainland and the Fraser Valley, which is fourteen cities from White Rock out to Chilliwack. We are not a province-wide contractor and do not pretend to be. Every city we name has a page setting out its own permit authority and route, with the municipality's own pages cited.
$120–$220 per sq ft turnkey — typically $300k–$550k for a 2,500 sq ft space. Base-building condition and finish level move that number most.
Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Book a Consultation
Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.