Reception desk and branded signage at The Shine Dental, a completed dental clinic build in White Rock, BC

Dental clinic · White Rock

The Shine Dental

The Shine Dental, signed Shine Family Dental Clinic, is a delivered dental clinic in White Rock.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Delivered

White Rock, BC

It is 2,500 sq ft with five operatories. The clinic was operational at handover, 90 days end to end.

  • 90 days end to end. Five operatories. The clinic was operational at handover.

Scope of work

  • Planning and permits
  • Five operatories
  • Plumbing and electrical
  • Millwork
  • Equipment locations planned before handover
  • CBCT imaging room
  • Sterilization
  • Reception and staff workstations

Photographs

Gallery

  • Reception desk and branded signage at The Shine Dental, a completed dental clinic build in White Rock, BC

    Reception desk and branded signage at The Shine Dental, a completed dental clinic build in White Rock, BC

  • Slatted timber ceiling and front-of-house at The Shine Dental, White Rock

    Slatted timber ceiling and front-of-house at The Shine Dental, White Rock

  • Finished dental operatory with chair, overhead light and service cabinetry at The Shine Dental, White Rock

    Finished dental operatory with chair, overhead light and service cabinetry at The Shine Dental, White Rock

  • Sterilization bay with cabinetry and equipment at The Shine Dental, White Rock

    Sterilization bay with cabinetry and equipment at The Shine Dental, White Rock

  • Reception workstations behind the front desk at The Shine Dental clinic, White Rock, BC.

    Reception workstations behind the front desk at The Shine Dental clinic, White Rock, BC.

  • Operatory corridor looking toward the sterilization area at The Shine Dental clinic, White Rock.

    Operatory corridor looking toward the sterilization area at The Shine Dental clinic, White Rock.

  • Clinic corridor with a frosted sliding door at The Shine Dental clinic, White Rock, BC.

    Clinic corridor with a frosted sliding door at The Shine Dental clinic, White Rock, BC.

  • Dental operatory with a treatment chair and side sink at The Shine Dental clinic, White Rock.

    Dental operatory with a treatment chair and side sink at The Shine Dental clinic, White Rock.

  • Dental operatory with a tan treatment chair at The Shine Dental clinic, White Rock, BC.

    Dental operatory with a tan treatment chair at The Shine Dental clinic, White Rock, BC.

  • CBCT imaging room in The Shine Dental clinic, White Rock, BC.

    CBCT imaging room in The Shine Dental clinic, White Rock, BC.

  • Sterilization sink and millwork at The Shine Dental clinic, White Rock, BC.

    Sterilization sink and millwork at The Shine Dental clinic, White Rock, BC.

  • Staff office with wood millwork at The Shine Dental clinic, White Rock, BC.

    Staff office with wood millwork at The Shine Dental clinic, White Rock, BC.

  • Accessible washroom with grab bars in The Shine Dental clinic, White Rock, BC.

    Accessible washroom with grab bars in The Shine Dental clinic, White Rock, BC.

  • Washroom with wood vanity and hexagon tile at The Shine Dental clinic, White Rock, BC.

    Washroom with wood vanity and hexagon tile at The Shine Dental clinic, White Rock, BC.

Questions

Where is The Shine Dental?

The Shine Dental, signed Shine Family Dental Clinic, is in White Rock, British Columbia.

How long did The Shine Dental take to build?

90 days end to end, with five operatories. The clinic was operational at handover.

How large is The Shine Dental clinic?

The published size is 2,500 sq ft, with five operatories.

Planning a dental clinic in White Rock?

Tell us the address and the use. We will say what has to be planned before construction starts.

(604) 385-3770