156 St pharmacy
#1-2233 156 St, Surrey, BC
- Specialty
- Pharmacy
- City permit authority
- City of Surrey — Building Division
- Pharmacy fit-out
- In progress at #1-2233 156 Street, Surrey
Services
Healthcare
Healthcare ConstructionDental Clinic ConstructionDental Office RenovationMedical Clinic ConstructionPharmacy ConstructionPhysiotherapy Clinic ConstructionChiropractic Clinic ConstructionOptometry Clinic ConstructionVeterinary Clinic ConstructionClinic Renovation ContractorDental clinic design-buildMedical clinic interior designDental millwork and cabinetryDental equipment and plumbingX-ray room shieldingOperatory plumbing and vacuumDental clinic permits in BCBuying or starting a practiceDental office floor plansClinic Launch Incentives
Oberizon Construction
A physiotherapy clinic wants an open rehab floor and a set of quiet treatment rooms. Those two are opposite builds inside one suite.
Clinic launch incentives
Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.
The short answer
Open rehab floor is the cheaper square footage. Enclosed treatment rooms are not. The published band is $150–$320 per sq ft, and a 2,000 sq ft mix is about $300,000–$640,000 before equipment.
2026 range
$300,000 – $640,000
$150–$320 per sq ft turnkey — typically $300k–$640k for a 2,000 sq ft space.
That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.
Estimate your buildWhat's included
Physiotherapy and rehab clinics built around treatment rooms, an open gym, acoustics and accessible circulation.
New and relocated physiotherapy and rehab clinics in the Lower Mainland are planned as two kinds of space. The open rehab floor wants height, impact-rated flooring and durability. The treatment rooms want quiet walls, cleanable finishes and plumbing to several rooms rather than to every room.
Enclosed rooms with cleanable finishes and a door that actually closes.
Impact-rated flooring and structure for overhead equipment.
A front door that is not the gym, and a place for equipment that is not in a treatment room.
The gym and the treatment rooms do not share a wall if both are going to work.
Door widths and washrooms planned for patients who arrive with mobility limits.
The physiotherapy guide on this site places the build in the $150–$320 per sq ft healthcare band, usually the lower half when the floor stays open. A 2,000 sq ft mix is about $300,000–$640,000 for the tenant improvement. Equipment is separate. Construction is often 3 to 5 months after the permit.
The long version is the physiotherapy and med spa guide.
Oberizon has not published a physiotherapy clinic. The cards below are adjacent clinical work. They are a med spa and a pharmacy. They are not physiotherapy clinics and they are not relabelled dental jobs.
Oberizon has not published a physiotherapy clinic. The projects below are adjacent clinical work. A med spa is not a physio clinic and a pharmacy is not one either.
The work
#1-2233 156 St, Surrey, BC

Abbotsford, BC
Where we build it
Managed from the White Rock office. Pick your city for local detail, pricing and the projects nearest you.
Guides
Cost, timeline and permit detail for physiotherapy clinic construction, with the numbers left in.
Where to go next
Questions
Oberizon Construction does. We are a White Rock, BC general contractor and we build physiotherapy and rehab clinics in Vancouver and Surrey from that office. Treatment rooms and the open gym are planned as different rooms. Call (604) 385-3770. There is no published physio project yet.
A physiotherapy clinic sits in the $150–$320 per sq ft healthcare band, usually the lower half when the floor stays open. A 2,000 sq ft mix is about $300,000–$640,000 for the tenant improvement. That figure is the physiotherapy guide on this site. Equipment is separate.
$150–$320 per sq ft turnkey — typically $300k–$640k for a 2,000 sq ft space. Base-building condition and finish level move that number most.
Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Book a Consultation
Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.