Richmond, BC
Commercial Contractors in Richmond, BC
Richmond accepts a commercial application only when the drawing set is already complete. Files go in through MyPermit. An incomplete package is turned away rather than parked in a queue to be finished later.
- Building since 2021
- Licensed & fully insured
- 35+ delivered projects
Experience
The same team, every build.
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Richmond runs through the same four stages.
- Building since 2021
- 5+yearsBuilding since 2021
- Plus 5 in progress
- 35+deliveredPlus 5 in progress
- Fastest clinic, five operatories
- 90daysFastest clinic, five operatories
- 01
Review
We walk the space and price the risk before you commit to anything.
- 02
Plan
Drawings and permits go in while equipment and long-lead items are ordered.
- 03
Build
One site lead holds the trades and calls you with progress every week.
- 04
Handover
Inspections cleared and the deficiency list closed before you take the keys.
Permits
Building in Richmond.
Delta soil is the fact that changes a Richmond structural scope. Coring a slab or hanging a heavy imaging unit on an older Steveston floor needs engineering before the city reviews the permit. A No. 3 Road medical floor and a Steveston plaza are not the same shell.
The practical effect is that the Richmond package is built to the published list before it is uploaded. That list takes a site plan of the whole building with the tenant marked on it. It also takes a dimensioned floor plan that shows the exits and the fire separations. Plumbing is drawn to the current BC Plumbing Code. Exterior changes inside a development permit area can require that permit ahead of the building permit.
- Permit authority
- City of Richmond — Building Approvals
- Commercial route
- Commercial applications are submitted through the MyPermit portal and are assessed against a published document checklist.
Reviews
What clinic owners say.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
The market here
What Richmond is like to build in.
Richmond's commercial space runs from the Brighouse city centre through the Ironwood and Bridgeport business parks out to the older Steveston village stock, and the mix is unusually varied for one municipality. A large share of the medical and dental tenancy sits in mid-rise professional buildings around No. 3 Road, while the business parks carry the light-industrial and lab-adjacent work. Much of the city is built on delta soil, which is why structural changes get engineering attention earlier here than in most Lower Mainland municipalities.
2026 commercial range
$120–$220 per sq ft
The same band applies in every city we work in. What changes is why a job sits high or low inside it.
Why Richmond sits where it does
Richmond lands in the middle of the site-wide commercial band. More of the fee arrives up front because the city wants a finished drawing set before it will open a file. Newer space on No. 3 Road is usually simpler after that approval. Older Steveston units spend the same band on electrical capacity and water service.
Where to go next
Also built in Richmond.
Not quite the right city?
Next door.
Guides
Before you start in this city.
Permit routes, costs and the questions worth asking a contractor before you shortlist one in Richmond.
Choosing a Contractor
10 questions for a healthcare contractor
The ten questions to ask a healthcare construction contractor in BC before you shortlist, what a good answer sounds like, and how to compare bids that priced different scopes.
11 min read
Permits & Compliance
Commercial renovation permits in BC
The permits a commercial renovation needs in BC — building, trade, and the approvals that come before them — plus which Lower Mainland cities publish a review window and which do not.
10 min read
Timelines
New dental clinic build timeline
A realistic dental clinic build timeline for BC, phase by phase from lease signing to opening day, plus the delays that push it back.
8 min read
Questions
Frequently asked.
Who issues the building permit in Richmond?
City of Richmond — Building Approvals issues it, reviewed against the BC Building Code and the city's own zoning. Commercial applications are submitted through the MyPermit portal and are assessed against a published document checklist.
How long does a commercial permit take in Richmond?
Richmond does not publish a commercial review window, so we confirm the current one with the city at application rather than quoting a figure from a previous job. Budget 6 to 16 weeks for permits and 10 to 16 weeks on site for a 2,500 sq ft fit-out.
What does commercial construction cost in Richmond?
Commercial construction runs $120–$220 per sq ft in 2026, and that band is the same across every city we work in. Richmond lands in the middle of the site-wide commercial band. More of the fee arrives up front because the city wants a finished drawing set before it will open a file. Newer space on No. 3 Road is usually simpler after that approval. Older Steveston units spend the same band on electrical capacity and water service.
What makes building in Richmond different?
Delta soil is the fact that changes a Richmond structural scope. Coring a slab or hanging a heavy imaging unit on an older Steveston floor needs engineering before the city reviews the permit. A No. 3 Road medical floor and a Steveston plaza are not the same shell.
Does Oberizon work in Richmond?
Yes, from the White Rock office, across Richmond's commercial corridors and healthcare communities. Ask us for the nearest comparable job to yours.
Planning a commercial build in Richmond?
Before you sign a lease, commit to drawings or set an opening date, book a consultation and we will tell you what has to be planned before construction starts.