
West Cordova residential build
West Cordova, Vancouver, BC
- Specialty
- Luxury residential
- City permit authority
- City of Vancouver — Development and Building Services Centre
Services
Healthcare
Healthcare ConstructionDental Clinic ConstructionDental Office RenovationMedical Clinic ConstructionPharmacy ConstructionPhysiotherapy Clinic ConstructionChiropractic Clinic ConstructionOptometry Clinic ConstructionVeterinary Clinic ConstructionClinic Renovation ContractorDental clinic design-buildMedical clinic interior designDental millwork and cabinetryDental equipment and plumbingX-ray room shieldingOperatory plumbing and vacuumDental clinic permits in BCBuying or starting a practiceDental office floor plansClinic Launch IncentivesCommercial
Commercial ConstructionCommercial RenovationOffice Renovation ContractorTenant Improvement Contractor
Vancouver, BC
Vancouver is the only municipality in the region that does not build to the BC Building Code. It permits under its own Vancouver Building By-law, runs a separate tenant improvement stream for office space, and applies access rules that decide more of a downtown schedule than the trades do.
Experience
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Vancouver runs through the same four stages.

We walk the space and price the risk before you commit to anything.
Drawings and permits go in while equipment and long-lead items are ordered.
One site lead holds the trades and calls you with progress every week.
Inspections cleared and the deficiency list closed before you take the keys.
Permits
Vancouver's Tenant Improvement Program removes the development permit and expedites the field review for office tenants in eligible buildings. Any commercial office building permitted after 31 January 2007 is on that list automatically. It is an office programme, so a clinic fit-out does not qualify and runs the standard route.
The practical effect is that eligibility is worth checking before the lease. An office tenant in a post-2007 building skips a development permit entirely, and a tenant one building over does not.
The work

West Cordova, Vancouver, BC
Reviews
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
The market here
Vancouver's professional and clinical tenancy is spread thin across the city — Cambie and Mount Pleasant carry a lot of the medical and dental space, Kitsilano and the West Side run smaller practices, and downtown is mostly office and retail. Buildings are older and denser than anywhere else in the region, and a large share of commercial space is strata-owned, which adds an approval layer before the city is even involved. Access is the recurring cost: limited loading, restricted work hours in mixed residential buildings, and material handling that has to be scheduled rather than assumed.
2026 commercial range
$120–$220 per sq ft
The same band applies in every city we work in. What changes is why a job sits high or low inside it.
Why Vancouver sits where it does
Vancouver sits at the top of the band and the reason is access rather than trades. Elevator bookings, loading windows and restricted work hours in mixed residential buildings add days that never appear on a drawing.
Clinics
Medical, clinic renovation, dental and pharmacy each have a Vancouver page. Physiotherapy has a city page in Vancouver and Surrey. Chiropractic, optometry and veterinary link to the service page.
Where to go next
Not quite the right city?
Guides
Permit routes, costs and the questions worth asking a contractor before you shortlist one in Vancouver.
Choosing a Contractor
The ten questions to ask a healthcare construction contractor in BC before you shortlist, what a good answer sounds like, and how to compare bids that priced different scopes.
11 min read
Permits & Compliance
The permits a commercial renovation needs in BC — building, trade, and the approvals that come before them — plus which Lower Mainland cities publish a review window and which do not.
10 min read
Cost
Office renovation cost in Metro Vancouver by size, refresh against full fit-out, what drives commercial construction cost per square foot, and what the landlord pays.
10 min read
Questions
Yes. Oberizon holds the prime contract on commercial and clinical build-outs in Vancouver, carrying the trades and answering for the deficiency list rather than brokering the job out. We delivered a residential build on West Cordova, so the downtown access problem is a known quantity rather than something we discover in week three.
Yes. A renovation inside the city boundary is reviewed against the Vancouver Building By-law rather than the BC Building Code, which is a different rulebook from every other city we work in. Office tenants in buildings permitted after 31 January 2007 should check the Tenant Improvement Program first, because it removes the development permit entirely.
City of Vancouver — Development and Building Services Centre issues it, reviewed against the Vancouver Building By-law and the city's own zoning. Vancouver permits under its own Vancouver Building By-law rather than the BC Building Code and runs a Tenant Improvement Program for office tenants in eligible buildings.
Vancouver does not publish a commercial review window, so we confirm the current one with the city at application rather than quoting a figure from a previous job. Budget 6 to 16 weeks for permits and 10 to 16 weeks on site for a 2,500 sq ft fit-out.
Commercial construction runs $120–$220 per sq ft in 2026, and that band is the same across every city we work in. Vancouver sits at the top of the band and the reason is access rather than trades. Elevator bookings, loading windows and restricted work hours in mixed residential buildings add days that never appear on a drawing.
Vancouver's Tenant Improvement Program removes the development permit and expedites the field review for office tenants in eligible buildings. Any commercial office building permitted after 31 January 2007 is on that list automatically. It is an office programme, so a clinic fit-out does not qualify and runs the standard route.
Yes. West Cordova residential build — addresses and photographs are on this page. Every job is run from the White Rock office rather than handed to a local sub.
Before you sign a lease, commit to drawings or set an opening date, book a consultation and we will tell you what has to be planned before construction starts.