Renovating a dental office means working around a live clinic that still has patients booked. We delivered a residential project on West Cordova, so we know what a downtown Vancouver build actually costs in coordination time. The work here is rarely about the trades — it is about elevator bookings, loading bay windows, strata approvals and the fact that nothing arrives on site whenever it is convenient.
Experience
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Vancouver runs through the same four stages.

We walk the space and price the risk before you commit to anything.
Drawings and permits go in while equipment and long-lead items are ordered.
One site lead holds the trades and calls you with progress every week.
Inspections cleared and the deficiency list closed before you take the keys.
The work

West Cordova, Vancouver, BC
Reviews
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Local planning
Vancouver runs a Tenant Improvement Program for office tenants in eligible buildings, which removes the need for a new development permit and gives an expedited field review. Any commercial office building permitted after 31 January 2007 is on that list automatically. The programme covers office work rather than clinical fit-outs, so a medical or dental build follows the standard building permit route.
Vancouver's professional and clinical tenancy is spread thin across the city — Cambie and Mount Pleasant carry a lot of the medical and dental space, Kitsilano and the West Side run smaller practices, and downtown is mostly office and retail. Buildings are older and denser than anywhere else in the region, and a large share of commercial space is strata-owned, which adds an approval layer before the city is even involved. Access is the recurring cost: limited loading, restricted work hours in mixed residential buildings, and material handling that has to be scheduled rather than assumed.
2026 range
$120–$260 per sq ft
turnkey — typically $240k–$520k for a 2,000 sq ft space
What that covers
What decides this build
The practice keeps seeing patients, so the clinic is rebuilt in zones with a working sterilization route maintained throughout. Losing sterilization for a day closes the whole practice, not one operatory.
The clinic is split into zones and rebuilt one at a time, with dust barriers and a temporary sterilization route kept in service. Weekend cutovers cover anything that would take an operatory offline mid-week.
We walk the space and price the risk before you commit to dental office renovation. Permits and services are the two that bite.
A temporary route is in service before the permanent one comes offline. Losing sterilization closes the practice, not one room.
Operatories come out of service in planned groups, with weekend cutovers for anything that would otherwise cost a weekday.
Where to go next
Questions
Yes — we have delivered a project in Vancouver, including West Cordova residential build. We run dental office renovation across the Lower Mainland from a White Rock head office.
The building permit is issued by City of Vancouver — Development and Building Services Centre, reviewed against the Vancouver Building By-law and the city's own zoning. Vancouver permits under its own Vancouver Building By-law rather than the BC Building Code and runs a Tenant Improvement Program for office tenants in eligible buildings. We confirm the current review window with the city at application rather than quoting one from a previous job.
$120–$260 per sq ft turnkey — typically $240k–$520k for a 2,000 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.
Most conversations start around Mount Pleasant, Kitsilano, and Cambie. We travel further when the scope justifies it.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Yes, by rebuilding in zones and keeping a working sterilization route in service throughout. Phasing around live patient hours typically adds 30 to 50% to the programme against a full closure, and protects production days that would otherwise be lost.
Sterilization, above everything. Losing it for a day closes the practice rather than one operatory, so a temporary route is established before the permanent one comes offline.
Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.
Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.