272 St dental clinic (B115)
#B115-8100 272 St, Langley, BC

Langley, BC
Langley is two municipalities, not one. The Township and the City permit separately, and the address decides which of them reviews your drawings — not the mailing city on your lease. We have two dental builds in progress on 272 Street, in the same complex.
Experience
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Langley runs through the same four stages.
We walk the space and price the risk before you commit to anything.
Drawings and permits go in while equipment and long-lead items are ordered.
One site lead holds the trades and calls you with progress every week.
Inspections cleared and the deficiency list closed before you take the keys.
Permits
The Township of Langley runs a Tenant Improvement X-Press service — an expedited route for eligible interior projects, applied for separately from the standard tenant improvement stream and administered by its Permit, Licence and Inspection Services department. The City of Langley is a different municipality with its own tenant improvement guide and no equivalent published stream.
The practical effect is that the boundary has to be checked before anything else. Two addresses a few hundred metres apart can sit in different municipalities, go to different departments and follow different application routes — and eligibility for the Township's X-Press stream is worth confirming before the drawings are packaged, not after.
The work
#B115-8100 272 St, Langley, BC
#E100-8100 272 St, Langley, BC
Reviews
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
The market here
Langley's professional space has followed its residential growth outward, so much of the newer clinic and office tenancy sits in Willoughby and along the 200 Street corridor rather than in the older City core. A lot of it is recent construction in mixed-use or standalone commercial buildings, which generally means adequate base-building services and fewer structural surprises than the older municipalities. Walnut Grove, Murrayville and Brookswood carry smaller neighbourhood practices. The market skews toward family healthcare — dental, medical and pharmacy — tracking the young families that have driven the area's growth.
2026 commercial range
$120–$220 per sq ft
The same band applies in every city we work in. What changes is why a job sits high or low inside it.
Why Langley sits where it does
Langley prices at the lower-middle of the band. Much of the clinic and office stock in Willoughby and along the 200 Street corridor is recent construction, which usually means adequate base-building services and fewer structural surprises than the older municipalities, and the drive from White Rock adds nothing to a job.
Where to go next
Not quite the right city?
Guides
Permit routes, costs and the questions worth asking a contractor before you shortlist one in Langley.
Choosing a Contractor
A vetting checklist for hiring a general contractor in Metro Vancouver: what to verify before you shortlist, the questions that separate three bids, and what proximity is actually worth.
10 min read
Permits & Compliance
The permits a commercial renovation needs in BC — building, trade, and the approvals that come before them — plus which Lower Mainland cities publish a review window and which do not.
10 min read
Timelines
A realistic dental clinic build timeline for BC, phase by phase from lease signing to opening day, plus the delays that push it back.
8 min read
Questions
Township of Langley Permit, Licence and Inspection Services (City of Langley Development Services for City addresses) issues it, reviewed against the BC Building Code and the city's own zoning. Tenant Improvement application, with a Tenant Improvement X-Press stream in the Township for eligible interior projects
Langley does not publish a commercial review window, so we confirm the current one with the city at application rather than quoting a figure from a previous job. Budget 6 to 16 weeks for permits and 10 to 16 weeks on site for a 2,500 sq ft fit-out.
Commercial construction runs $120–$220 per sq ft in 2026, and that band is the same across every city we work in. Langley prices at the lower-middle of the band. Much of the clinic and office stock in Willoughby and along the 200 Street corridor is recent construction, which usually means adequate base-building services and fewer structural surprises than the older municipalities, and the drive from White Rock adds nothing to a job.
The Township of Langley runs a Tenant Improvement X-Press service — an expedited route for eligible interior projects, applied for separately from the standard tenant improvement stream and administered by its Permit, Licence and Inspection Services department. The City of Langley is a different municipality with its own tenant improvement guide and no equivalent published stream.
Yes. 272 St dental clinic (B115), 272 St dental clinic (E100) — addresses and photographs are on this page. Every job is run from the White Rock office rather than handed to a local sub.
Before you sign a lease, commit to drawings or set an opening date, book a consultation and we will tell you what has to be planned before construction starts.