272 St dental clinic (B115)
#B115-8100 272 St, Langley, BC

Langley Construction
Renovating a working clinic means the practice keeps seeing patients throughout. We have two dental builds in progress on 272 Street in Langley, in the same complex. Langley splits into the City and the Township, and which one your address falls in decides who reviews the permit — a distinction that catches people out more often than any technical detail on the drawings.
Experience
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Langley runs through the same four stages.
We walk the space and price the risk before you commit to anything.
Drawings and permits go in while equipment and long-lead items are ordered.
One site lead holds the trades and calls you with progress every week.
Inspections cleared and the deficiency list closed before you take the keys.
The work
#B115-8100 272 St, Langley, BC
#E100-8100 272 St, Langley, BC
Reviews
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Local planning
Oberizon works across the Lower Mainland, including Langley City and the Township. Every project is planned around site access, inspection windows and how the finished space has to run.
Langley's professional space has followed its residential growth outward, so much of the newer clinic and office tenancy sits in Willoughby and along the 200 Street corridor rather than in the older City core. A lot of it is recent construction in mixed-use or standalone commercial buildings, which generally means adequate base-building services and fewer structural surprises than the older municipalities. Walnut Grove, Murrayville and Brookswood carry smaller neighbourhood practices. The market skews toward family healthcare — dental, medical and pharmacy — tracking the young families that have driven the area's growth.
2026 range
$120–$240 per sq ft
turnkey — typically $240k–$480k for a 2,000 sq ft space
What that covers
What decides this build
Construction happens inside a live clinical environment, so infection control governs the site, not just the finished space. Barriers, negative air and route separation are part of the build, not the cleanup.
Hoardings, negative air machines and a separated construction route go in before demolition starts, and staff and patient circulation is agreed with the practice in writing. IPAC expectations apply to the site during the work, not only to the space at handover.
We walk the space and price the risk before you commit to clinic renovation contractor. Permits and services are the two that bite.
Hoardings and negative air go in first. IPAC expectations apply to the site during the work, not only to the finished space.
The construction route is agreed with the practice in writing before the first wall is opened.
Where to go next
Questions
Yes — we have 2 projects in progress in Langley right now, including 272 St dental clinic (B115). We run clinic renovation contractor across the Lower Mainland from a White Rock head office.
Langley issues its own building permit, reviewed against the BC Building Code and the city's zoning bylaw, and the route differs from neighbouring municipalities. We confirm the current requirements with the city at the start of every job rather than working from the last one.
$120–$240 per sq ft turnkey — typically $240k–$480k for a 2,000 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.
Most conversations start around Willoughby, Walnut Grove, and Murrayville. We travel further when the scope justifies it.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Hoardings, negative air machines and a construction route separated from patient circulation go in before demolition. IPAC expectations apply to the site during the work, not only to the finished space.
Yes. The clinic is divided into zones and the disruptive work is scheduled outside clinical hours, with the route between them agreed with the practice in writing before the first barrier goes up.