Oberizon Construction
Reception desk and arched millwork at Skinholic Aesthetics medical spa, Abbotsford, BC

Oberizon Construction

Clinic Renovation Contractor

A clinic renovation keeps a medical, physio, chiro, optometry or veterinary practice seeing patients while the work runs.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

The short answer

What does it cost?

Medical, physio, chiro, optometry and veterinary renovations keep the practice open. Infection-control barriers go up before demolition. Dental offices have their own page.

2026 range

$240,000 – $480,000

$120–$240 per sq ft turnkey — typically $240k–$480k for a 2,000 sq ft space.

That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.

Estimate your build

What's included

Scope of the work.

Clinic renovations planned around clinical continuity, infection-sensitive details, services, and final readiness.

  • Clinic assessment and phasing
  • Service, finish, equipment, and patient-flow coordination
  • Deficiency management and reopening support

Medical office renovation.

A medical office renovation is a clinic that keeps seeing patients while one zone is rebuilt. Exam rooms, intake and staff circulation stay in use on the open side of the barrier. A new medical clinic in an empty suite is the medical clinic construction page. This page is the renovation.

Coquitlam has its own page: clinic renovation contractor in Coquitlam. The design of the rooms is on medical clinic interior design.

The work

Builds we have delivered.

Skinholic Aesthetics, Abbotsford, BC
Med spaDelivered

Skinholic Aesthetics

Abbotsford, BC

Specialty
Med spa
City permit authority
City of Abbotsford — Planning and Development Services
  • Med spa interior in Abbotsford
  • Planning, building permit, millwork, plumbing, electrical and mechanical
  • Interior design, carried out as per the drawings
  • Contract dated 25 July 2025. The job is closed
Read the case study
PharmacyIn progress

156 St pharmacy

156 Street, Surrey, BC

Specialty
Pharmacy
Size
1,500 sq ft
City permit authority
City of Surrey — Building Division
  • 1,500 sq ft pharmacy tenant improvement
  • Planning, building permit, millwork, plumbing, electrical and mechanical
  • Flooring, lighting and washrooms
  • In progress on 156 Street

Questions

Frequently asked.

How is infection control handled during renovation?

IPAC barriers go up before demolition. Negative pressure is maintained on our side so the practice keeps operating. CSA Z317.13 is the infection-control practice for construction inside a clinic that stays open.

What is a dental clinic renovation?

It is the same work as a dental office renovation. The clinic stays open in phases. On site the work is often 8 to 16 weeks after the building permit. The published band is $120–$260 per sq ft.

What is a medical office renovation?

It is a clinic renovation. The practice stays open behind IPAC barriers while exam rooms are rebuilt in zones. CSA Z317.13 is the infection-control practice. A new clinic in an empty suite is medical clinic construction instead.

Can you renovate a clinic while it stays open?

Yes. Oberizon Construction phases medical, physio, chiro, optometry and veterinary renovations so one zone stays in service. Hoardings and negative air go in before demolition. The route is agreed in writing. Dental renovations have their own page.

Do you renovate medical clinics as well as dental offices?

Yes. Clinic renovation at Oberizon Construction covers medical, physiotherapy, chiropractic, optometry and veterinary practices, plus med spa work already in the portfolio. Dental office renovation stays on its own page so the two scopes do not compete.

How much does a clinic renovation cost?

$120–$240 per sq ft turnkey — typically $240k–$480k for a 2,000 sq ft space. Base-building condition and finish level move that number most.

Where does Oberizon deliver clinic renovation contractor?

Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.

What should I have ready before starting?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Book a Consultation

Planning a clinic renovation in the Lower Mainland? Tell us the space.

Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.

WhatsAppCall