Oberizon Construction
Sterilization bay with sink, cabinetry and instrument storage in a finished clinic

Vancouver Construction

Clinic Renovation Contractor in Vancouver, BC

Renovating a working clinic means the practice keeps seeing patients throughout. We delivered a residential project on West Cordova, so we know what a downtown Vancouver build actually costs in coordination time. The work here is rarely about the trades — it is about elevator bookings, loading bay windows, strata approvals and the fact that nothing arrives on site whenever it is convenient.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Vancouver runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Vancouver.

Vancouver runs a Tenant Improvement Program for office tenants in eligible buildings, which removes the need for a new development permit and gives an expedited field review. Any commercial office building permitted after 31 January 2007 is on that list automatically. The programme covers office work rather than clinical fit-outs, so a medical or dental build follows the standard building permit route.

Vancouver's professional and clinical tenancy is spread thin across the city — Cambie and Mount Pleasant carry a lot of the medical and dental space, Kitsilano and the West Side run smaller practices, and downtown is mostly office and retail. Buildings are older and denser than anywhere else in the region, and a large share of commercial space is strata-owned, which adds an approval layer before the city is even involved. Access is the recurring cost: limited loading, restricted work hours in mixed residential buildings, and material handling that has to be scheduled rather than assumed.

Mount PleasantKitsilanoCambieDowntown

2026 range

$120–$240 per sq ft

turnkey — typically $240k–$480k for a 2,000 sq ft space

What that covers

  • Clinic assessment and phasing
  • Service, finish, equipment, and patient-flow coordination
  • Deficiency management and reopening support

What decides this build

Construction happens inside a live clinic. Medical and physio and chiro and optometry and veterinary renovations keep the practice open in zones. Barriers and negative air go in before demolition.

Hoardings and negative air go in before demolition. Staff and patient routes are agreed in writing. CSA Z317.13 and IPAC practice apply while the clinic stays open. They do not wait for handover.

Project review

We walk the space and price the risk before you commit to clinic renovation contractor. Permits and services are the two that bite.

Barriers before demolition

Hoardings and negative air go in first. IPAC expectations and CSA Z317.13 apply during the work. They do not wait for handover.

Separated circulation

The construction route is agreed with the practice in writing before the first wall is opened.

Where to go next

Also built in Vancouver.

Commercial Contractors in VancouverPermits, delivered work and every service we run in Vancouver.Medical clinic construction in VancouverA new medical clinic. This page is the renovation.Commercial ConstructionChoose this if you need to hire a commercial construction company with clear scope, budget, and schedule control.Commercial RenovationChoose this if you need to renovate an active or upcoming business space without losing control of schedule or cost.Office Renovation ContractorChoose this if you need to renovate or build an office that supports staff flow, client experience, and daily operation.Healthcare ConstructionChoose this if you need to build a healthcare space where services, permits, patient flow, and handover cannot be improvised.All service areasCompare how Oberizon works across the Lower Mainland.All Clinic Renovation ContractorSee the full service, pricing and every city we build it in.Estimate your buildSet your own square footage and see the range.Clinic Renovation Contractor in SurreyThe Surrey page. This page stays on Vancouver.Clinic Renovation Contractor in AbbotsfordThe Abbotsford page. This page stays on Vancouver.Clinic Renovation Contractor in LangleyThe Langley page. This page stays on Vancouver.Clinic Renovation Contractor in BurnabyThe Burnaby page. This page stays on Vancouver.Clinic Renovation Contractor in RichmondThe Richmond page. This page stays on Vancouver.Clinic Renovation Contractor in CoquitlamThe Coquitlam page. This page stays on Vancouver.Clinic Renovation Contractor in White RockThe White Rock page. This page stays on Vancouver.Clinic Renovation Contractor in ChilliwackThe Chilliwack page. This page stays on Vancouver.

Questions

Frequently asked.

Does Oberizon handle clinic renovation contractor in Vancouver?

Yes — we have delivered a project in Vancouver, including West Cordova residential build. We run clinic renovation contractor across the Lower Mainland from a White Rock head office.

Who issues the building permit for clinic renovation contractor in Vancouver?

The building permit is issued by City of Vancouver — Development and Building Services Centre, reviewed against the Vancouver Building By-law and the city's own zoning. Vancouver permits under its own Vancouver Building By-law rather than the BC Building Code and runs a Tenant Improvement Program for office tenants in eligible buildings. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does a clinic renovation cost in Vancouver?

$120–$240 per sq ft turnkey — typically $240k–$480k for a 2,000 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Vancouver does Oberizon serve for clinic renovation contractor?

Most conversations start around Mount Pleasant, Kitsilano, and Cambie. We travel further when the scope justifies it.

What should I prepare before starting clinic renovation contractor in Vancouver?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

How is infection control handled while a clinic is under construction?

Hoardings and negative air go in before demolition. A construction route stays off the patient path. IPAC practice and CSA Z317.13 apply during the work. They do not wait for handover.

Can you renovate a clinic while it stays open?

Yes. Oberizon Construction phases medical and physio and chiro and optometry and veterinary renovations in zones. One part of the clinic keeps seeing patients. The disruptive work runs outside those hours.

Can you renovate a clinic in Vancouver while it stays open?

Yes. Oberizon Construction phases a clinic renovation in Vancouver behind IPAC barriers. CSA Z317.13 infection-control practice applies while one zone stays open. The route is agreed before demolition.

Can Oberizon review my Vancouver space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning a clinic renovation in Vancouver?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770