
Private office build
White Rock, BC
- Specialty
- Commercial office
- City permit authority
- City of White Rock Building Division
- Commercial office fit-out in White Rock
Services
Healthcare
Healthcare ConstructionDental Clinic ConstructionDental Office RenovationMedical Clinic ConstructionPharmacy ConstructionPhysiotherapy Clinic ConstructionChiropractic Clinic ConstructionOptometry Clinic ConstructionVeterinary Clinic ConstructionClinic Renovation ContractorDental clinic design-buildMedical clinic interior designDental millwork and cabinetryDental equipment and plumbingX-ray room shieldingOperatory plumbing and vacuumDental clinic permits in BCBuying or starting a practiceDental office floor plansClinic Launch IncentivesCommercial
Commercial ConstructionCommercial RenovationOffice Renovation ContractorTenant Improvement Contractor
Oberizon Construction
An office renovation runs while staff are still in the building.
The short answer
Staff stay in the building, so the job runs in zones. Each zone is sealed, finished and handed back before the next one opens.
2026 range
$300,000 – $550,000
$120–$220 per sq ft turnkey — typically $300k–$550k for a 2,500 sq ft space.
That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.
Estimate your buildWhat's included
Private offices and professional interiors built with layout, acoustic, finish, and workflow discipline.
An office renovation is judged on the things nobody draws: how the room sounds in a meeting, whether the lighting works on a video call, and how long the floor smells of adhesive. Acoustic separation between rooms, lighting levels at the desk and a finish schedule that off-gasses before staff return are all specification decisions made long before anyone picks a carpet.
Meeting and HR rooms are detailed to the deck rather than to the ceiling grid. A partition that stops at the tile is a partition that leaks conversation.
The floor is split into zones, each sealed and handed back finished before the next one opens. Staff stay in the building throughout.
What has to come back out at lease end is confirmed before it goes in, so the reinstatement cost is known rather than discovered.
The work

White Rock, BC

White Rock, BC
90 days end to end. Five operatories.

Unit 115, Aldergrove, BC
Completed June 2026.
Where we build it
Managed from the White Rock office. Pick your city for local detail, pricing and the projects nearest you.
Guides
Cost, timeline and permit detail for office renovation contractor, with the numbers left in.
Leases & Planning
Triple net vs gross vs modified gross leases in BC: who pays property tax, insurance and CAM, and how to compare offers on total occupancy cost.
7 min read
Timelines
How to phase an office renovation around a working business — what phasing costs in time and money, the test for whether your space can take it, and when to move out.
10 min read
Cost
Office renovation cost in Metro Vancouver by size, refresh against full fit-out, what drives commercial construction cost per square foot, and what the landlord pays.
10 min read
Leases & Planning
What a tenant improvement allowance actually covers, what it rarely does, and how to price your buildout against it before signing.
7 min read
Where to go next
Questions
Not normally. The floor is split into zones, each sealed and handed back finished before the next opens.
$120–$220 per sq ft turnkey — typically $300k–$550k for a 2,500 sq ft space. Base-building condition and finish level move that number most.
Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Book a Consultation
Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.