Oberizon Construction
Slatted timber ceiling above the reception at The Shine Dental, White Rock, BC

Burnaby Construction

Office Renovation Contractor in Burnaby, BC

An office renovation runs while staff are still in the building. Almost every commercial suite in Burnaby sits underneath somebody's apartment. That single fact governs the work here: restricted hours, strata approval before the city sees anything, and mechanical routing that has to respect the floors above. We plan a Burnaby fit-out around those three from the first drawing.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Burnaby is served from the White Rock office, and the tower-podium buildings here are the type we work in across the region.

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Burnaby runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Burnaby.

Burnaby reviews a tenant improvement either on the fast track or through a full plan review, and a plan checker decides which. Anything needing Fraser Health approval is excluded from the fast track by the city's own guide. That covers salons, esthetics and skin-care work, so a med spa here goes to full review and needs Fraser Health sign-off before the permit application is made.

Burnaby's commercial space clusters around four town centres rather than a single core, and the newer supply at Metrotown, Brentwood and Lougheed is largely podium retail and professional space beneath residential towers. That building type dictates most of the work: shared services, strata rules, and mechanical routing that has to respect the residential floors above. Older stock around Edmonds and Hastings runs smaller and closer to the Vancouver pattern. The clinic demand here is steady rather than spiking, tied to the residential density arriving with each tower completion.

MetrotownBrentwoodLougheedEdmonds

2026 range

$120–$220 per sq ft

turnkey — typically $300k–$550k for a 2,500 sq ft space

What that covers

  • Office layout and finish planning
  • Meeting rooms, reception, storage, and staff areas
  • Construction sequencing with minimal operational friction

What decides this build

Staff stay in the building, so the work is measured in decibels and dust as much as in square feet. Data cabling density is usually the item that has been under-scoped.

Acoustic separation between meeting rooms and open floor is specified at drawing stage — a partition taken to the ceiling tile instead of the deck is the single most common complaint after handover, and it cannot be fixed without reopening the ceiling.

Project review

We walk the space and price the risk before you commit to office renovation contractor. Permits and services are the two that bite.

Acoustic separation

Partitions are taken to the deck where privacy matters. Correcting that after handover means reopening the ceiling.

Cabling density

Data and low-voltage are counted at drawing stage rather than discovered on the day the desks arrive.

Questions

Frequently asked.

Does Oberizon handle office renovation contractor in Burnaby?

Yes. We run office renovation contractor across the Lower Mainland from our White Rock head office, and that includes Burnaby's central Lower Mainland business districts. Tell us the address and we will walk the space before you commit to anything.

Who issues the building permit for office renovation contractor in Burnaby?

The building permit is issued by City of Burnaby — Building Division, reviewed against the BC Building Code and the city's own zoning. Burnaby reviews a tenant improvement either on a fast track or through a full plan review and a plan checker decides which one applies. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does an office renovation cost in Burnaby?

$120–$220 per sq ft turnkey — typically $300k–$550k for a 2,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Burnaby does Oberizon serve for office renovation contractor?

Most conversations start around Metrotown, Brentwood, and Lougheed. We travel further when the scope justifies it.

What should I prepare before starting office renovation contractor in Burnaby?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

How is noise handled when staff stay in the building?

Demolition, coring and anything percussive runs outside working hours, and finishing trades run during the day behind sealed hoardings. The programme is built around the tenancy's quiet hours rather than the trades' preference.

What is most often under-scoped in an office fit-out?

Data and low-voltage density, and acoustic separation. Partitions stopped at the ceiling tile rather than the deck are the most common post-handover complaint, and correcting them means reopening the ceiling.

Can Oberizon review my Burnaby space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning an office renovation in Burnaby?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770