One millwork scope

Dental casework is three families of furniture that have to agree. The reception desk is the public face. The sterilization cabinets are a clinical route. The operatory casework serves a chair that cannot move after the slab is cut. This is one page because splitting them into three URLs would invent three intents for one shop drawing.

The build itself is dental clinic construction at $300–$450 per square foot across the Lower Mainland. A renovation of an existing practice is dental office renovation at $120–$260 per square foot across the same region. Neither band is a city price. Neither band is a millwork-only rate. There is no separate cabinetry price on this site. Casework is inside the build.

Reception desks

The desk has to see the entry and still give a patient a place to speak without the waiting room hearing the whole conversation. A transaction height and a seated height are both real needs. So is a bag shelf and a place for the computer that is not the patient's view of the schedule.

The desk is also a barrier. It should not force every arrival into the clinical corridor. The photographs of The Shine Dental in White Rock and the Marshall Road clinic at 104-33069 Marshall Road in Abbotsford show reception casework in finished clinics. They are the desks we can point at. We do not invent a third reception as a case study.

Sterilization cabinetry

Sterilization runs dirty to clean in one direction. The cabinets follow that arrow. Dirty receiving is not a drawer on the clean side. Clean storage is not an open shelf over the scrub sink. The counters are wipeable. The joints are tight enough to clean. Open grain and decorative gaps do not belong at this bench.

The route is drawn before the millwork is ordered. A shop drawing that arrives first will be wrong or it will force the clinical layout to follow a cabinet. We refuse that order. The planning version of the rooms is in dental office floor plans. Those are planning layouts. They are not a client's drawings and they are not a named plan set.

On a renovation the sterilization cabinets may be the last pieces to land. A temporary route has to work until they do. The permanent boxes are measured to replace that route. They are not measured to look like the old room. Weekend cutovers are how the practice switches from the temporary bench to the finished one without losing a Monday.

Operatory casework

Operatory cabinets follow the chair. The chair does not follow the cabinets. Delivery units and side units need a clear reach. A door cannot open into the assistant's standing place. If the chair moves after rough-in the plumbing moves with it. The casework would be rebuilt too. That is why dental equipment and plumbing is the paired page. Chair location drives the rough-in. Cabinetry is the finish on that decision.

Drawers are for what the room uses every hour. Deep storage for slow stock belongs out of the operatory. A clinic that fills every chair-side cabinet with bulk supplies loses the working surface. We mark that split on the drawing so the shop does not build a warehouse into a treatment room.

Order and proof

Design is often 6–12 weeks. Permits are often 6–16 weeks. Construction for a typical clinic is about 10–16 weeks after permits. Millwork lead time sits inside that sequence. Waiting until the walls are closed to order cabinets is how a finished shell sits empty.

The BC College of Oral Health Professionals registers the dentist. The municipality issues the building permit. The college does not review the shop drawings. Cabinetry still has to match the permit set. A field change that moves a wall moves the cabinets and the permit.

Two dental clinics are in progress at #B115 and #E100, 8100 272 Street in Langley. They are new construction. They are not a millwork catalogue. Vancouver's recorded project is a house on West Cordova. It is not a clinic and it has no dental casework to show. City shells differ. Start with Vancouver, Surrey or Langley when the address is the question. Bring the chair count. We will say what has to be drawn before the shop cuts a panel.

Questions

Frequently asked.

What dental millwork does this page cover?

Reception desks, sterilization cabinetry and operatory casework. It is one scope. The chair positions are fixed before the casework is ordered.

Is there a separate millwork price per square foot?

No separate millwork band is published. Dental clinic construction is $300–$450 per square foot. Dental office renovation is $120–$260 per square foot. Both are Lower Mainland bands. Casework sits inside the build. It is not its own rate.

When is sterilization cabinetry ordered?

After the dirty-to-clean route is drawn. Ordering boxes before that route is fixed is how a clean counter ends up on the dirty side.

How long does a typical clinic take to build?

Design is often 6–12 weeks. Permits are often 6–16 weeks. Construction for a typical clinic is about 10–16 weeks after permits. Millwork is ordered against that sequence. It is not ordered after the walls close.