Oberizon Construction
Reception desk and branded signage at The Shine Dental, a completed dental clinic build in White Rock, BC

White Rock, BC

Commercial Contractors in White Rock, BC

Our office is on Foster Street, which puts most of the work on this page inside a ten-minute drive. White Rock is surrounded by Surrey but permits independently of it, through its own Building Division. An approval from the municipality next door carries no weight here.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near White Rock runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

Permits

Building in White Rock.

White Rock is a geographic enclave inside Surrey that runs its own Building Division, its own Zoning Bylaw and its own Official Community Plan. A use that is permitted on one side of the boundary can be refused on the other, and the boundary is not obvious from the street.

The practical effect is that zoning has to be confirmed against White Rock's own bylaw before a lease is signed. Finding out afterwards that the use needs a rezoning is not a drawing revision, it is a different building.

Permit authority
City of White Rock Building Division
Commercial route
White Rock issues a distinct Commercial Tenant Improvement permit, separate from the residential stream.

The work

Builds we have delivered near White Rock.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Private office build, White Rock, BC
Commercial officeDelivered

Private office build

White Rock, BC

Specialty
Commercial office
City permit authority
City of White Rock Building Division
  • Commercial office fit-out in White Rock

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

The market here

What White Rock is like to build in.

White Rock's commercial space is concentrated in the uptown blocks around Johnston Road and Five Corners, with the Marine Drive strip running retail and hospitality. It is a compact market with an older population, which is why dental, denture, physiotherapy and optometry practices take up so much of the professional tenancy. Units are small and often sit above or behind retail, so servicing and access are the first questions, not the last. The city is geographically enclaved within Surrey but permits separately, under its own Building Division.

Uptown White RockFive CornersMarine DriveEast Beach

2026 commercial range

$120–$220 per sq ft

The same band applies in every city we work in. What changes is why a job sits high or low inside it.

Why White Rock sits where it does

There is no travel cost from our office and no downtown access premium. What moves a White Rock number is the building stock — small older units where a wall coming down reveals what the drawings did not show.

Clinics

Clinic construction in White Rock.

Medical, clinic renovation, dental and pharmacy each have a White Rock page. Physiotherapy has a city page in Vancouver and Surrey. Chiropractic, optometry and veterinary link to the service page.

Where to go next

Also built in White Rock.

Commercial RenovationChoose this if you need to renovate an active or upcoming business space without losing control of schedule or cost.Office Renovation ContractorChoose this if you need to renovate or build an office that supports staff flow, client experience, and daily operation.Healthcare ConstructionChoose this if you need to build a healthcare space where services, permits, patient flow, and handover cannot be improvised.Dental Clinic ConstructionThe Shine Dental is ten minutes from the office and is photographed on this site.Dental Office RenovationChoose this if you need to renovate a dental office while protecting workflow, patient experience, and technical service requirements.Medical Clinic ConstructionChoose this if you need to build a medical clinic with exam rooms, reception, services, privacy, and staff workflow coordinated.Pharmacy ConstructionChoose this if you need to build a pharmacy with customer flow, back-of-house function, storage, security, and handover clarity.Physiotherapy Clinic ConstructionChoose this if you need to build a physiotherapy or rehab clinic with treatment rooms and an open gym planned as different kinds of space.Chiropractic Clinic ConstructionChoose this if you need to build a chiropractic clinic with private treatment rooms and room for more than one practitioner.Optometry Clinic ConstructionChoose this if you need to build an optometry clinic where the exam lanes and the dispensary are planned as one floor.Veterinary Clinic ConstructionChoose this if you need to build a veterinary clinic with washdown finishes, kennel acoustics and species-separated waiting.Clinic Renovation ContractorChoose this if you need to renovate a healthcare clinic with service, schedule, staff, and patient impacts mapped before work starts.Luxury Residential ConstructionChoose this if you need to build a high-end home with detail, finish, sequencing, and senior oversight managed tightly.Custom Home BuildingChoose this if you need to build a new home from the ground up with the schedule, budget and finish standard held.Home RenovationChoose this if you need to renovate or extend a house you are living in without losing the run of it.

Questions

Frequently asked.

Who issues the building permit in White Rock?

City of White Rock Building Division issues it, reviewed against the BC Building Code and the city's own zoning. White Rock issues a distinct Commercial Tenant Improvement permit, separate from the residential stream.

How long does a commercial permit take in White Rock?

White Rock does not publish a commercial review window, so we confirm the current one with the city at application rather than quoting a figure from a previous job. Budget 6 to 16 weeks for permits and 10 to 16 weeks on site for a 2,500 sq ft fit-out.

What does commercial construction cost in White Rock?

Commercial construction runs $120–$220 per sq ft in 2026, and that band is the same across every city we work in. There is no travel cost from our office and no downtown access premium. What moves a White Rock number is the building stock — small older units where a wall coming down reveals what the drawings did not show.

What makes building in White Rock different?

White Rock is a geographic enclave inside Surrey that runs its own Building Division, its own Zoning Bylaw and its own Official Community Plan. A use that is permitted on one side of the boundary can be refused on the other, and the boundary is not obvious from the street.

Does Oberizon work in White Rock?

Yes. The Shine Dental, Private office build — addresses and photographs are on this page. Every job is run from the White Rock office rather than handed to a local sub.