Oberizon Construction
Timber-slat reception desk in a completed clinic interior

White Rock Construction

Commercial Renovation in White Rock, BC

Renovating an occupied space means working around a business that still has to trade. Our office is in White Rock, which means a site visit here costs you a phone call rather than a scheduled trip. The commercial stock on and around Marine Drive and Five Corners is small-footprint and largely older, so the constraint is rarely the design — it is what the building will actually support once a wall comes down.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near White Rock runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered near White Rock.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in White Rock.

White Rock permits independently of Surrey despite being surrounded by it — a Surrey approval carries no weight here. The Building Division reviews against the City's Zoning Bylaw and Official Community Plan as well as the provincial construction regulations, so a use that is permitted in a neighbouring municipality still has to clear White Rock's own zoning.

White Rock's commercial space is concentrated in the uptown blocks around Johnston Road and Five Corners, with the Marine Drive strip running retail and hospitality. It is a compact market with an older population, which is why dental, denture, physiotherapy and optometry practices take up so much of the professional tenancy. Units are small and often sit above or behind retail, so servicing and access are the first questions, not the last. The city is geographically enclaved within Surrey but permits separately, under its own Building Division.

Uptown White RockFive CornersMarine DriveEast Beach

2026 range

$95–$180 per sq ft

turnkey — typically $240k–$450k for a 2,500 sq ft space

What that covers

  • Existing space review and scope mapping
  • Phased renovation planning
  • Finish, millwork, service, and handover coordination

What decides this build

The building keeps trading while you work in it. Every noisy hour, every shared corridor and every fire-alarm isolation has to be agreed with a landlord who has other tenants to answer to.

Work is sequenced against the tenancy schedule: demolition and anything that breaks the fire-alarm loop happens after hours, finishing trades run in the day. The programme is written around the landlord's approval turnaround, which is the item most often assumed rather than confirmed.

Project review

We walk the space and price the risk before you commit to commercial renovation. Permits and services are the two that bite.

Trading protected

Noisy work runs outside opening hours. The unit keeps trading and the neighbouring tenants are not the ones complaining.

Landlord approvals

Drawing sign-off is scheduled with a defined response window written into the programme rather than assumed.

Questions

Frequently asked.

Does Oberizon handle commercial renovation in White Rock?

Yes — we have delivered 2 projects in White Rock, including The Shine Dental. We run commercial renovation across the Lower Mainland from a White Rock head office.

Who issues the building permit for commercial renovation in White Rock?

The building permit is issued by City of White Rock Building Division, reviewed against the BC Building Code and the city's own zoning. White Rock issues a distinct Commercial Tenant Improvement permit, separate from the residential stream. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does commercial renovation cost in White Rock?

$95–$180 per sq ft turnkey — typically $240k–$450k for a 2,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near White Rock does Oberizon serve for commercial renovation?

Most conversations start around Uptown White Rock, Five Corners, and Marine Drive. We travel further when the scope justifies it.

What should I prepare before starting commercial renovation in White Rock?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Can the business keep trading during a commercial renovation?

Usually yes. Work is split into zones, with demolition and anything affecting the fire-alarm loop scheduled after hours. Phasing around an operating business typically extends the programme by roughly a third against an empty unit, and protects the revenue that would otherwise stop.

Who approves the work in a leased commercial unit?

The landlord approves the drawings before the building permit is applied for, and that approval window is the most commonly underestimated part of the schedule. We ask for a defined response time in writing rather than assuming one.

Can Oberizon review my White Rock space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning commercial renovation in White Rock?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770