Renovating a dental office means working around a live clinic that still has patients booked.
The short answer
The shutdown is planned before a wall is touched. Most clinics keep operating through the work, in phases.
2026 range
$240,000 – $520,000
$120–$260 per sq ft turnkey — typically $240k–$520k for a 2,000 sq ft space.
That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.
Estimate your buildWhat's included
Dental office renovations built around the realities of clinical workflow and technical service coordination.
Most dental office renovations run 8 to 16 weeks on site once the permit is in hand, with the clinic operating through all of it in phases. The number moves on how much operatory plumbing and electrical has to shift, not on the size of the waiting room. Moving chairs is the expensive decision; changing finishes around them is not.
Reception, millwork, flooring and paint with no service relocation. Typically 4 to 6 weeks, and the clinic rarely loses a day.
Chairs replaced on existing service locations, with cabinetry and imaging updated. Typically 8 to 12 weeks in phases.
Chair positions moved, so suction, water and drainage move with them. Typically 12 to 16 weeks and the largest driver of the budget.
The work

White Rock, BC

104-33069 Marshall Road, Abbotsford, BC

Abbotsford, BC
Where we build it
Managed from the White Rock office. Pick your city for local detail, pricing and the projects nearest you.
Guides
Cost, timeline and permit detail for dental office renovation, with the numbers left in.
Cost
What a dental office renovation costs in BC in 2026, by clinic size and by scope, and why moving a chair costs more than changing every finish in the building.
9 min read
Timelines
A realistic dental office renovation timeline for BC practices, including how to keep seeing patients while the work runs.
7 min read
Leases & Planning
A 12-step dental office renovation checklist for BC practices, ordered the way the work actually has to happen.
8 min read
Where to go next
Questions
Most clinics keep seeing patients. The work runs in phases behind sealed barriers, planned around your booking schedule.
No. The two words describe the same work and it is priced the same way: existing conditions reviewed, the clinic phased so it keeps operating, and services rerouted before the finishes go back. What moves the number is how much of the operatory plumbing and electrical has to shift, not which word is on the quote.
Eight to sixteen weeks on site once the permit is issued, with the clinic operating in phases throughout. A finishes-only remodel of reception and millwork runs 4 to 6 weeks. Moving chair positions is what pushes it to the top of that range, because suction, water and drainage move with them.
$120–$260 per sq ft turnkey — typically $240k–$520k for a 2,000 sq ft space. Base-building condition and finish level move that number most.
Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Book a Consultation
Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.