Oberizon Construction
Reception desk and storage cabinetry in a completed dental clinic build

Burnaby Construction

Dental Office Renovation in Burnaby

Renovating a dental office means a live practice can stay open. Newer Burnaby suites sit under apartments. A plan checker chooses fast track or full review. The applicant does not choose.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Burnaby is served from the White Rock office, and the tower-podium buildings here are the type we work in across the region.

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Burnaby runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Burnaby.

Burnaby reviews a tenant improvement either on the fast track or through a full plan review, and a plan checker decides which. Anything needing Fraser Health approval is excluded from the fast track by the city's own guide. That covers salons, esthetics and skin-care work, so a med spa here goes to full review and needs Fraser Health sign-off before the permit application is made.

Burnaby's commercial space clusters around four town centres rather than a single core, and the newer supply at Metrotown, Brentwood and Lougheed is largely podium retail and professional space beneath residential towers. That building type dictates most of the work: shared services, strata rules, and mechanical routing that has to respect the residential floors above. Older stock around Edmonds and Hastings runs smaller and closer to the Vancouver pattern. The clinic demand here is steady rather than spiking, tied to the residential density arriving with each tower completion.

MetrotownBrentwoodLougheedEdmonds

2026 range

$120–$260 per sq ft

turnkey — typically $240k–$520k for a 2,000 sq ft space

What that covers

  • Existing clinic review and renovation phasing
  • Operatory, sterilization, reception, and staff-area updates
  • Deficiency control before reopening or launch

What decides this build

The practice keeps seeing patients, so the clinic is rebuilt in zones with a working sterilization route maintained throughout. Losing sterilization for a day closes the whole practice, not one operatory.

The clinic is split into zones and rebuilt one at a time, with dust barriers and a temporary sterilization route kept in service. Weekend cutovers cover anything that would take an operatory offline mid-week.

Project review

We walk the space and price the risk before you commit to dental office renovation. Permits and services are the two that bite.

Sterilization kept live

A temporary route is in service before the permanent one comes offline. Losing sterilization closes the practice, not one room.

Zone by zone

Operatories come out of service in planned groups, with weekend cutovers for anything that would otherwise cost a weekday.

Renovating under someone's apartment

A dental office renovation in Burnaby is usually a suite under occupied apartments. Metrotown and Brentwood and Lougheed are podium buildings. The residential floors above decide the hours. Edmonds and Hastings still have smaller and older units. Those units have fewer neighbours upstairs and more surprises in the walls. The zone plan has to say which kind of building you are in.

The practice stays open by closing rooms in groups. A podium renovation cannot hammer through a residential evening. The noisy work is booked inside the hours the strata will actually allow. If those hours are only weekends the programme says so at the start. Pretending the site can run like an empty warehouse is how the schedule fails.

Patient access is part of the same drawing. People still arrive by the residential elevator or the podium lobby. The construction route should not be their route. Hoarding and a separate door for debris are sorted with the strata before the first bin is placed. A renovation that blocks the only lobby stair is not a renovation the building will tolerate.

Sterilization stays in service

The sterilization room is rebuilt last or it is rebuilt with a temporary route already running. Instruments from the live chairs still need a dirty side and a clean side. One direction. The temporary bench is not a counter in a staff lunch room. It is a clinical station with a sink and a clear path.

Weekend cutovers are the tool for anything that stops water or power or suction to a live chair. In a Burnaby podium the weekend is also when the elevator can be booked. A cutover that needs a compressor move and an elevator slot is one event. It is not two hopes on two different days.

Dust above a treatment room is a clinical problem and a neighbour problem. Negative air and sealed barriers are in the scope. They are not a cleanup item. The strata will hear the work. The patients should not breathe it. Both constraints are written down before demolition.

The plan checker decides the path

The City of Burnaby Building Division reviews a tenant improvement on a fast track or a full plan review. A plan checker chooses. The applicant does not. We package the mechanical scope so the checker can see the vacuum and the air and the drains on the first submission. We do not promise the fast track for a multi-chair dental renovation.

The city's guide removes jobs that need Fraser Health approval from the fast track. The published examples are salons and esthetics and skin care. A dental renovation is not a salon. It still adds plumbing and a compressor and often a change to how rooms are used. That is what the checker is judging. Calling it a salon to chase a faster queue would be false.

Strata approval usually comes before the city's review. Noise windows and riser work and any core through a common slab are corporation matters. The BC College of Oral Health Professionals registers the dentist. Burnaby issues the building permit. The college does not review the drawings. Fraser Health is the health authority south of the North Shore.

The clinics we can walk you through

There is no photographed Oberizon dental renovation in Burnaby in this portfolio. The delivered dental clinics we can show are The Shine Dental in White Rock and the Marshall Road clinic at 104-33069 Marshall Road in Abbotsford. Two dental clinics are in progress at #B115 and #E100, 8100 272 Street in Langley. Those Langley suites are new construction. They show a dental build. They are not a Burnaby renovation. A new dental clinic construction project in Burnaby is a different page from this renovation.

Burnaby is served from the White Rock office. The podium is a building type we plan for across the region. Planning for the type is not the same as claiming a local renovation we have not delivered. The essay on this page is the method. The photographs live with the clinics that were actually built.

Dental office renovation is published at $120–$260 per square foot for the Lower Mainland. It is not a Burnaby price. Design is often 6–12 weeks. Permits are often 6–16 weeks. Construction for a typical clinic is about 10–16 weeks after permits. A podium renovation adds the strata's hours on top of that sequence. Bring the address and the rooms that have to stay open.

Where to go next

Also built in Burnaby.

Commercial Contractors in BurnabyPermits, delivered work and every service we run in Burnaby.Dental clinic construction in BurnabyA new dental build. This page is the renovation of a clinic that already runs.Commercial ConstructionChoose this if you need to hire a commercial construction company with clear scope, budget, and schedule control.Commercial RenovationChoose this if you need to renovate an active or upcoming business space without losing control of schedule or cost.Office Renovation ContractorChoose this if you need to renovate or build an office that supports staff flow, client experience, and daily operation.Healthcare ConstructionChoose this if you need to build a healthcare space where services, permits, patient flow, and handover cannot be improvised.All service areasCompare how Oberizon works across the Lower Mainland.All Dental Office RenovationSee the full service, pricing and every city we build it in.Estimate your buildSet your own square footage and see the range.Medical clinic interior designExam rooms, reception, staff flow and finishes. Construction stays on the medical clinic page.Dental millwork and cabinetryReception desks, sterilization cabinetry and operatory casework on one page.Dental equipment and plumbingChair location drives the rough-in for vacuum, air and the drain.X-ray room shieldingShielding is drawn before the walls close.Operatory plumbing and vacuumVacuum, compressed air and a dedicated drain for each chair.Dental clinic permits in BCThe college registers the dentist. The municipality issues the building permit.Buying or starting a practiceA purchase may still need a renovation. A start is a shell.Dental office floor plansPlanning layouts for reception, sterilization, operatories and the mechanical room.

Questions

Frequently asked.

Can a Burnaby dental practice stay open during a renovation?

Yes. Rooms close in zones. Sterilization stays live on a temporary route. Noisy work and elevator bookings follow the strata hours. Weekend cutovers cover the tie-ins.

Does Burnaby fast-track a dental renovation permit?

A plan checker chooses the fast track or a full review. The applicant does not. Fraser Health approval removes the fast track for salons and esthetics and skin care. A dental renovation is not a salon. We do not promise the fast track.

What does a dental office renovation cost in Burnaby?

The published Lower Mainland band is $120–$260 per square foot. It is not a Burnaby price. Strata hours and how much of the clinic stays open move a job inside the band.

Who permits a dental renovation in Burnaby?

The City of Burnaby issues the building permit. The BC College of Oral Health Professionals registers the dentist. The college does not review the drawings. The strata approves hours and slab work before that permit application.

Planning dental office renovation in Burnaby?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770