West Cordova residential build
West Cordova, Vancouver, BC

Oberizon Construction
New homes taken from excavation to occupancy, with the finish schedule driving procurement rather than trailing it.
The short answer
New homes taken from excavation to occupancy, with the finish schedule driving procurement rather than trailing it.
2026 range
Price varies by scope and site conditions.
That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.
Estimate your buildWhat's included
New homes taken from excavation to occupancy, with the finish schedule driving procurement rather than trailing it.
The work

West Cordova, Vancouver, BC

White Rock, BC

White Rock, BC
Where we build it
Managed from the White Rock office. Pick your city for local detail, pricing and the projects nearest you.
Guides
Cost, timeline and permit detail for custom home builder, with the numbers left in.
Timelines
How long a custom home takes in BC from design to keys, phase by phase, using published Surrey and Vancouver permit times and what pushes the date back.
7 min read
Choosing a Contractor
An eight-step checklist for vetting a custom home builder in BC, from the licence and the warranty enrolment to the Builders Lien Act holdback you have to keep.
10 min read
Permits & Compliance
What Bill 44 and Bill 25 now require your city to allow, how garden suites and secondary suites differ as builds, and what decides whether a suite is possible at all.
11 min read
Where to go next
Questions
Before framing completes. Stone, custom millwork and specialty glazing are ordered against framing dates, so a selection still open at drywall stops the site rather than the showroom.
Price varies by scope, finish level and site conditions.
Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Book a Consultation
Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.