Leases & Planning5 min read

Buying or Starting a Dental Practice in BC

Buying a practice and starting one are different business choices. They are also different construction problems. This guide is the construction difference. It is not a market study. There are no sale prices and no patient counts here.

A purchase can still need a renovation. A start is usually a shell. Confusing the two is how a buyer budgets a coat of paint and then discovers the vacuum lines are in the wrong floor.

Key takeaway. Ask what has to be rebuilt before you treat a purchase as turnkey. Ask whether a start-up shell can take the final chair count before you sign the lease. The college registers you. The city permits the work.

Two different construction problems

A purchase hands you rooms that already exist. Someone chose the chair dots. Someone ran the drains. Someone built the sterilization cabinets in a direction that may or may not be dirty to clean. You inherit those decisions with the charts.

A start hands you a shell. The shell might be a former office or a former shop or a new unit that has never had a sink beyond a lunch room. Nothing clinical is in the floor yet. That is more work. It is also a cleaner drawing. You are not protecting a Tuesday book while you rebuild.

The business choice is yours and your advisors'. The construction scope is what we can talk about. How to open a dental office in BC walks the start-up sequence from the site to the permit. This page is the fork before that sequence. Which path you are on changes the first drawing.

We will not tell you which path makes more money. We will tell you which path is a renovation and which path is a shell. Those words change the permit and the phasing and the band you should be reading.

A purchase may still need a renovation

Walk the clinic before you rely on the seller's photos. Count the chairs you need at maturity, not the chairs in the room today. Look at sterilization. If instruments cross back through the clean side, the cabinets are wrong even if they are new. Look at the mechanical room. A compressor sized for three chairs will not carry six.

A renovation of a live practice is zoned. Patients can stay. Sterilization has to stay live. Weekend cutovers take the tie-ins. That method is dental office renovation. City versions sit under Vancouver, Surrey, Burnaby and Langley. Langley's named dental work at #B115 and #E100, 8100 272 Street is new construction. It is not an example of buying a practice and renovating it.

The published renovation band is $120–$260 per square foot across the Lower Mainland. It is not a price for the goodwill of the practice. It is the construction band. Landlord and strata approval still apply. You may be renovating a suite the seller does not own. Read the lease assignment. The remaining term has to be long enough to justify the work you cannot take with you.

The BC College of Oral Health Professionals registers the dentist. A purchase of charts does not replace that registration. It also does not replace the building permit if you move walls or plumbing. The permit guide is dental clinic permits in BC.

A start is a shell

A start-up is chair positions and services and shielding from a blank plan. Dental office floor plans describes the rooms as planning layouts. They are not a client's drawings. Use them to see reception and waiting and a one-way sterilization path and operatories and a mechanical room. Then draw the suite you actually leased.

The shell needs vacuum and compressed air and a drain at each chair. That is dental equipment and plumbing. The casework follows. That is dental millwork and cabinetry. Imaging walls are drawn before they close. That is x-ray room shielding.

Dental clinic construction is published at $300–$450 per square foot across the Lower Mainland. It is not a city price. Design is often 6–12 weeks. Permits are often 6–16 weeks. Construction for a typical clinic is about 10–16 weeks after permits. Chairs and imaging equipment often carry 12–20 week lead times. A shell looks empty. The calendar is not empty.

The contract that holds design and construction together is dental clinic design-build. One party should see the suite before the drawings are sealed. A start-up that tenders a sealed set the builder has never walked is how the chair dots miss the slab.

What to settle before you sign

On a purchase, ask what you must keep and what you may change. Some leases and some strata bylaws limit the work. A clinic that cannot move a chair cannot become the clinic you modelled. Ask whether patients will remain in the building during the work. If they will, you are pricing a phased renovation. If they will not, you may still be in a building with neighbours who control the hours.

On a start, ask whether the shell can take the final chair count. A narrow unit can need more area than a square one for the same number of operatories. Ask where the compressor can live. Ask whether the slab can be cored. Ask which city hall has the address. Langley is two municipalities. Vancouver uses its own by-law and its office program does not cover clinics.

We can show two delivered dental clinics. The Shine Dental is in White Rock. The Marshall Road clinic is at 104-33069 Marshall Road in Abbotsford. The Langley pair is in progress and it is new construction. Vancouver's recorded project is a house on West Cordova. It is not a practice for sale and it is not a shell for a clinic. We will not assign any other clinic to a city to make a comparison feel local.

Conclusion

Buying and starting are different businesses and different builds. A purchase may still need a renovation at $120–$260 per square foot. A start is a shell at $300–$450 per square foot. Both bands are Lower Mainland bands. Neither one is a valuation of a practice. Bring the lease and say which path you are on. We will tell you what has to be planned before construction starts.

Frequently asked questions

Does buying a dental practice avoid construction?

Not always. A purchase can still need a renovation. The chairs and the sterilization route and the lease may not match the practice you intend to run.

What construction does a start-up usually face?

A start is usually a shell. Chair positions, vacuum, air, drains and shielding are all still ahead of you. Dental clinic construction is $300–$450 per square foot across the Lower Mainland.

What does a renovation of a purchased clinic cost?

Dental office renovation is published at $120–$260 per square foot across the Lower Mainland. It is not a price for one city. How much of the clinic stays open moves a job inside the band.

How long is the build after you choose?

Design is often 6–12 weeks. Permits are often 6–16 weeks. Construction for a typical clinic is about 10–16 weeks after permits. A purchase that stays open is sequenced in zones and can run longer than an empty shell.

The service this article is about

Dental clinic builds coordinated around operatories, sterilization, plumbing, electrical, cabinetry, and patient flow.

Dental Clinic Construction →

Opening or moving a clinic? See healthcare clinic construction and our clinic launch incentives.