Oberizon Construction
Reception desk and timber slat wall at a completed family dentist clinic

Oberizon Construction

Commercial Renovation

Renovating an occupied space means working around a business that still has to trade.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

The short answer

What does it cost?

Work is phased around trading hours. Noisy demolition happens when the space is empty, not when customers are in it.

2026 range

$240,000 – $450,000

$95–$180 per sq ft turnkey — typically $240k–$450k for a 2,500 sq ft space.

That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.

Estimate your build

What's included

Scope of the work.

Renovations planned around how the space needs to function before demolition, trades, and finishes begin.

  • Existing space review and scope mapping
  • Phased renovation planning
  • Finish, millwork, service, and handover coordination

Tenant improvement contractors.

A tenant improvement is the same trade work as a renovation with a different party paying for it, and the difference matters. The landlord's allowance is fixed, the lease sets what reverts at the end of term, and the municipality often treats the permit as its own category. We price the work against the allowance rather than against a wish list, so the gap is visible before anything is signed.

  • Against the allowance

    Scope is priced against the improvement allowance in the lease, so the shortfall is a number at the start rather than a surprise at the end.

  • Its own permit category

    Abbotsford, Chilliwack and both North Vancouver municipalities run tenant improvements as a distinct permit type. The package is built to that route from the start.

  • Base building versus tenant

    What the landlord owes and what you owe is a lease question with a construction bill attached. We map it before demolition rather than after.

Commercial tenant improvement contractor for the Lower Mainland.

A tenant improvement is work inside a building someone else owns. Ground-up construction is a new building. The trades can look the same. The contract does not.

The landlord approves the tenant drawings. The lease draws the line between base building and tenant work. Base building is the shell and the services to the suite. Tenant work is the partitions and the finishes. It is also the plumbing and the power the shell did not include. That split is in the base building guide.

Strata bylaws set the hours for noisy work. Those hours are settled before the city application. Newer Burnaby suites are podiums under occupied apartments. The Burnaby hub covers the fast track and the full plan review.

A commercial renovation is published at $95–$180 per square foot. An office renovation is published at $120–$220 per square foot. Both bands cover the Lower Mainland. Neither band is a quote for one suite. What an allowance usually pays is in the allowance guide. The construction scope is on the leasehold improvements page. Cost per square foot is in the tenant improvement cost guide.

The work

Builds we have delivered.

Private office build, White Rock, BC
Commercial officeDelivered

Private office build

White Rock, BC

Specialty
Commercial office
City permit authority
City of White Rock Building Division
  • Commercial office fit-out in White Rock
The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Questions

Frequently asked.

Can we stay open during the renovation?

Usually yes. Work is phased and sealed by zone so the business keeps trading, which adds a little to the schedule and removes the cost of closing.

Is there a renovation contractor near me?

We renovate commercial space across fourteen cities from the White Rock office, covering the Lower Mainland and the Fraser Valley. Each city page names the municipality that issues the permit there and the route it uses, because that is the part that differs rather than the trade work.

Do you do tenant improvements as well as renovations?

Yes, and they are the same trade work under a different commercial arrangement. A tenant improvement is priced against the landlord's allowance and the reinstatement terms in the lease, and several municipalities here treat it as its own permit category rather than a general commercial application.

How much does commercial renovation cost?

$95–$180 per sq ft turnkey — typically $240k–$450k for a 2,500 sq ft space. Base-building condition and finish level move that number most.

Where does Oberizon deliver commercial renovation?

Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.

What should I have ready before starting?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Book a Consultation

Planning commercial renovation? Tell us the space.

Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.

WhatsAppCall