156 St pharmacy
#1-2233 156 St, Surrey, BC
- Specialty
- Pharmacy
- City permit authority
- City of Surrey — Building Division
- Pharmacy fit-out
- In progress at #1-2233 156 Street, Surrey
Services
Healthcare
Healthcare ConstructionDental Clinic ConstructionDental Office RenovationMedical Clinic ConstructionPharmacy ConstructionPhysiotherapy Clinic ConstructionChiropractic Clinic ConstructionOptometry Clinic ConstructionVeterinary Clinic ConstructionClinic Renovation ContractorDental clinic design-buildMedical clinic interior designDental millwork and cabinetryDental equipment and plumbingX-ray room shieldingOperatory plumbing and vacuumDental clinic permits in BCBuying or starting a practiceDental office floor plansClinic Launch Incentives
Oberizon Construction
A veterinary clinic shares the clinical core of a medical clinic and adds washdown finishes, kennel acoustics and species-separated waiting.
Clinic launch incentives
Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.
The short answer
Veterinary builds sit toward the intensive end of the healthcare band, $150–$320 per sq ft. Drains, washdown finishes and kennel acoustics are what push the number. The College of Veterinarians of BC accredits the facility.
2026 range
Price varies by scope and site conditions.
That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.
See the published bandWhat's included
Veterinary clinics planned for washdown finishes, kennel acoustics, species-separated waiting and CVBC facility expectations.
Exam rooms, surgery, imaging, lab and sterilization transfer from medical clinic construction. The veterinary part is washdown floors and floor drains, acoustic isolation around kennels, species-separated waiting and anesthetic gas scavenging. The College of Veterinarians of BC accredits the facility. The municipality issues the building permit.
The long version is the veterinary clinic guide. Healthcare construction is published at $150–$320 per sq ft. Vet scope pushes toward the intensive end of that band. There is no separate vet number on this site.
There is no veterinary clinic in the project record. Adjacent clinical work is shown and labelled with its real discipline.
There is no veterinary clinic in the project record. The cards below are other healthcare work. They are not veterinary clinics.
The work
#1-2233 156 St, Surrey, BC

Abbotsford, BC
Where we build it
Managed from the White Rock office. Pick your city for local detail, pricing and the projects nearest you.
Guides
Cost, timeline and permit detail for veterinary clinic construction, with the numbers left in.
Where to go next
Questions
Yes. Oberizon Construction is a White Rock, BC general contractor and plans veterinary clinics in Surrey, Vancouver and the other Lower Mainland cities we serve. Washdown finishes, kennel acoustics and species-separated waiting are the scope. There is no published veterinary project yet. Call (604) 385-3770.
Veterinary builds are priced toward the intensive end of healthcare construction at $150–$320 per sq ft. Drains, washdown finishes and kennel acoustics move the number. There is no separate veterinary total on this site. The College of Veterinarians of BC accredits the facility.
$150–$320 per sq ft turnkey — typically $375k–$800k for a 2,500 sq ft space. Veterinary scope sits toward the intensive end of that band.
Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Book a Consultation
Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.