156 St pharmacy
#1-2233 156 St, Surrey, BC
- Specialty
- Pharmacy
- City permit authority
- City of Surrey — Building Division
- Pharmacy fit-out
- In progress at #1-2233 156 Street, Surrey
Services
Healthcare
Healthcare ConstructionDental Clinic ConstructionDental Office RenovationMedical Clinic ConstructionPharmacy ConstructionPhysiotherapy Clinic ConstructionChiropractic Clinic ConstructionOptometry Clinic ConstructionVeterinary Clinic ConstructionClinic Renovation ContractorDental clinic design-buildMedical clinic interior designDental millwork and cabinetryDental equipment and plumbingX-ray room shieldingOperatory plumbing and vacuumDental clinic permits in BCBuying or starting a practiceDental office floor plansClinic Launch Incentives
Oberizon Construction
An optometry clinic is half exam lane and half retail dispensary. The refraction method sets the floor plan.
Clinic launch incentives
Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.
The short answer
The published band is $150–$260 per sq ft, the same as medical clinic construction. A 2,000 sq ft practice is about $300,000–$520,000 before ophthalmic equipment and frames.
2026 range
$300,000 – $520,000
$150–$260 per sq ft turnkey — typically $300k–$520k for a 2,000 sq ft space.
That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.
Estimate your buildWhat's included
Optometry and eye clinics built around refraction lanes, a dispensary and the equipment those rooms have to hold.
An optometry clinic splits in two. Exam lanes need controlled lighting and a length set by the refraction method. A mirror system fits a lane in about 10 to 12 feet. A true 20-foot lane rarely fits a retail depth. The dispensary is retail millwork, lighting and security for frames.
Cost and lane length are taken from the optometry clinic guide. The band is $150–$260 per sq ft. A 2,000 sq ft practice is about $300,000–$520,000 before equipment and frames.
There is no optometry clinic in the project record. The cards below are other clinical work. They are not eye clinics.
There is no optometry clinic in the project record. The cards below are other healthcare work. They are not eye clinics.
The work
#1-2233 156 St, Surrey, BC

Abbotsford, BC
Where we build it
Managed from the White Rock office. Pick your city for local detail, pricing and the projects nearest you.
Guides
Cost, timeline and permit detail for optometry clinic construction, with the numbers left in.
Where to go next
Questions
Oberizon Construction is a White Rock, BC general contractor for optometry and eye clinic construction in Vancouver, Surrey and the rest of the Lower Mainland. Lanes and the dispensary are planned together. There is no published optometry project yet. Call (604) 385-3770.
An optometry clinic runs $150–$260 per sq ft turnkey, the same band as medical clinic construction. A 2,000 sq ft practice is about $300,000–$520,000 before equipment and frames. The dispensary is what pushes a job toward the top of the band.
$150–$260 per sq ft turnkey — typically $300k–$520k for a 2,000 sq ft space. Base-building condition and finish level move that number most.
Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Book a Consultation
Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.