156 St pharmacy
#1-2233 156 St, Surrey, BC
- Specialty
- Pharmacy
- City permit authority
- City of Surrey — Building Division
- Pharmacy fit-out
- In progress at #1-2233 156 Street, Surrey
Services
Healthcare
Healthcare ConstructionDental Clinic ConstructionDental Office RenovationMedical Clinic ConstructionPharmacy ConstructionPhysiotherapy Clinic ConstructionChiropractic Clinic ConstructionOptometry Clinic ConstructionVeterinary Clinic ConstructionClinic Renovation ContractorDental clinic design-buildMedical clinic interior designDental millwork and cabinetryDental equipment and plumbingX-ray room shieldingOperatory plumbing and vacuumDental clinic permits in BCBuying or starting a practiceDental office floor plansClinic Launch Incentives
Oberizon Construction
A chiropractic clinic is private treatment rooms, a reception and enough plan for a second practitioner.
Clinic launch incentives
Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.
The short answer
There is no separate chiropractic rate on this site. The clinic is quoted from the space. Use the clinic renovation band of $120–$240 per sq ft as the pointer.
2026 range
Price varies by scope and site conditions.
That is the published range. Set your own square footage and finish level for a number against your actual space — no form to see the result.
See the published bandWhat's included
Chiropractic clinics planned as private treatment rooms, a reception and room for a multi-practitioner layout.
A chiropractic clinic in the Lower Mainland is usually a set of private treatment rooms, a reception and sometimes a rehab area shared with RMT or physiotherapy. The room count is the drawing. The reception has to still work when a second practitioner is booked at the same time.
This site does not publish a separate chiropractic band. The clinic is quoted from the space. The published clinic renovation band is $120–$240 per sq ft and is the pointer until a chiropractic job sets its own number.
See clinic renovation for that band and for work inside a practice that stays open.
There is no chiropractic clinic in the project record. Adjacent clinical work is shown so the page is not empty. It is not described as chiropractic.
There is no chiropractic clinic in the project record. The cards below are other healthcare work. They are not chiropractic projects.
The work
#1-2233 156 St, Surrey, BC

Abbotsford, BC
Where we build it
Managed from the White Rock office. Pick your city for local detail, pricing and the projects nearest you.
Where to go next
Questions
Oberizon Construction is a White Rock, BC general contractor that builds chiropractic clinics across the Lower Mainland, including Vancouver and Surrey. Private treatment rooms and the reception are the plan. There is no published chiropractic project yet. Call (604) 385-3770.
Oberizon quotes a chiropractic clinic from the space. The published clinic renovation band is $120–$240 per sq ft. Use that as the pointer. A separate chiropractic number is not published because no chiropractic job is on the project record.
$120–$240 per sq ft turnkey — typically $240k–$480k for a 2,000 sq ft space. A chiropractic clinic is quoted from the space.
Across the Lower Mainland from a White Rock head office, covering 14 cities from White Rock out to Chilliwack.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Book a Consultation
Tell us the space and the timeline. We will come back with what has to be planned before construction starts — anywhere from White Rock to Chilliwack.