Commercial Renovation in Vancouver, BC

Renovating an occupied space means working around a business that still has to trade. We delivered a residential project on West Cordova, so we know what a downtown Vancouver build actually costs in coordination time. The work here is rarely about the trades — it is about elevator bookings, loading bay windows, strata approvals and the fact that nothing arrives on site whenever it is convenient.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Vancouver runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Vancouver.

Vancouver runs a Tenant Improvement Program for office tenants in eligible buildings, which removes the need for a new development permit and gives an expedited field review. Any commercial office building permitted after 31 January 2007 is on that list automatically. The programme covers office work rather than clinical fit-outs, so a medical or dental build follows the standard building permit route.

Vancouver's professional and clinical tenancy is spread thin across the city — Cambie and Mount Pleasant carry a lot of the medical and dental space, Kitsilano and the West Side run smaller practices, and downtown is mostly office and retail. Buildings are older and denser than anywhere else in the region, and a large share of commercial space is strata-owned, which adds an approval layer before the city is even involved. Access is the recurring cost: limited loading, restricted work hours in mixed residential buildings, and material handling that has to be scheduled rather than assumed.

Mount PleasantKitsilanoCambieDowntown

2026 range

$95–$180 per sq ft

turnkey — typically $240k–$450k for a 2,500 sq ft space

What that covers

  • Existing space review and scope mapping
  • Phased renovation planning
  • Finish, millwork, service, and handover coordination

What decides this build

The building keeps trading while you work in it. Every noisy hour, every shared corridor and every fire-alarm isolation has to be agreed with a landlord who has other tenants to answer to.

Work is sequenced against the tenancy schedule: demolition and anything that breaks the fire-alarm loop happens after hours, finishing trades run in the day. The programme is written around the landlord's approval turnaround, which is the item most often assumed rather than confirmed.

Project review

We walk the space and price the risk before you commit to commercial renovation. Permits and services are the two that bite.

Trading protected

Noisy work runs outside opening hours. The unit keeps trading and the neighbouring tenants are not the ones complaining.

Landlord approvals

Drawing sign-off is scheduled with a defined response window written into the programme rather than assumed.

Questions

Frequently asked.

Does Oberizon handle commercial renovation in Vancouver?

Yes — we have delivered a project in Vancouver, including West Cordova residential build. We run commercial renovation across the Lower Mainland from a White Rock head office.

Who issues the building permit for commercial renovation in Vancouver?

The building permit is issued by City of Vancouver — Development and Building Services Centre, reviewed against the Vancouver Building By-law and the city's own zoning. Vancouver permits under its own Vancouver Building By-law rather than the BC Building Code and runs a Tenant Improvement Program for office tenants in eligible buildings. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does commercial renovation cost in Vancouver?

$95–$180 per sq ft turnkey — typically $240k–$450k for a 2,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Vancouver does Oberizon serve for commercial renovation?

Most conversations start around Mount Pleasant, Kitsilano, and Cambie. We travel further when the scope justifies it.

What should I prepare before starting commercial renovation in Vancouver?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Can the business keep trading during a commercial renovation?

Usually yes. Work is split into zones, with demolition and anything affecting the fire-alarm loop scheduled after hours. Phasing around an operating business typically extends the programme by roughly a third against an empty unit, and protects the revenue that would otherwise stop.

Who approves the work in a leased commercial unit?

The landlord approves the drawings before the building permit is applied for, and that approval window is the most commonly underestimated part of the schedule. We ask for a defined response time in writing rather than assuming one.

Can Oberizon review my Vancouver space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.