Oberizon Construction
Consultation room with desk and arched shelving in a completed clinic

New Westminster Construction

Dental Office Renovation in New Westminster, BC

Renovating a dental office means working around a live clinic that still has patients booked. We plan that before the site gets busy. Drawings, permits and trades are sequenced by one team out of White Rock.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near New Westminster runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in New Westminster.

Oberizon works across the Lower Mainland, including New Westminster's historic and high-density commercial areas. Every project is planned around site access, inspection windows and how the finished space has to run.

New Westminster work is shaped by older building conditions, healthcare tenancy. We use that to set scope and sequence before demolition starts.

UptownDowntownSappertonQueensborough

2026 range

$120–$260 per sq ft

turnkey — typically $240k–$520k for a 2,000 sq ft space

What that covers

  • Existing clinic review and renovation phasing
  • Operatory, sterilization, reception, and staff-area updates
  • Deficiency control before reopening or launch

What decides this build

The practice keeps seeing patients, so the clinic is rebuilt in zones with a working sterilization route maintained throughout. Losing sterilization for a day closes the whole practice, not one operatory.

The clinic is split into zones and rebuilt one at a time, with dust barriers and a temporary sterilization route kept in service. Weekend cutovers cover anything that would take an operatory offline mid-week.

Project review

We walk the space and price the risk before you commit to dental office renovation. Permits and services are the two that bite.

Sterilization kept live

A temporary route is in service before the permanent one comes offline. Losing sterilization closes the practice, not one room.

Zone by zone

Operatories come out of service in planned groups, with weekend cutovers for anything that would otherwise cost a weekday.

Questions

Frequently asked.

Does Oberizon handle dental office renovation in New Westminster?

Yes. We run dental office renovation across the Lower Mainland from our White Rock head office, and that includes New Westminster's historic and high-density commercial areas. Tell us the address and we will walk the space before you commit to anything.

Who issues the building permit for dental office renovation in New Westminster?

New Westminster issues its own building permit, reviewed against the BC Building Code and the city's zoning bylaw, and the route differs from neighbouring municipalities. We confirm the current requirements with the city at the start of every job rather than working from the last one.

How much does dental office renovation cost in New Westminster?

$120–$260 per sq ft turnkey — typically $240k–$520k for a 2,000 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near New Westminster does Oberizon serve for dental office renovation?

Most conversations start around Uptown, Downtown, and Sapperton. We travel further when the scope justifies it.

What should I prepare before starting dental office renovation in New Westminster?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Can a dental practice keep seeing patients during a renovation?

Yes, by rebuilding in zones and keeping a working sterilization route in service throughout. Phasing around live patient hours typically adds 30 to 50% to the programme against a full closure, and protects production days that would otherwise be lost.

What has to stay running while a clinic is renovated?

Sterilization, above everything. Losing it for a day closes the practice rather than one operatory, so a temporary route is established before the permanent one comes offline.

Can Oberizon review my New Westminster space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning dental office renovation in New Westminster?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770