Oberizon Construction
Living room of a completed custom home, with a linear fireplace set into a stone feature wall and walnut slat joinery

White Rock Construction

Luxury Residential Construction in White Rock, BC

A custom home is a finish schedule with a house attached to it. Our office is in White Rock, which means a site visit here costs you a phone call rather than a scheduled trip. The commercial stock on and around Marine Drive and Five Corners is small-footprint and largely older, so the constraint is rarely the design — it is what the building will actually support once a wall comes down.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near White Rock runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
Private office build, White Rock, BC
Commercial office · DeliveredPrivate office buildWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered near White Rock.

Private office build, White Rock, BC
Commercial officeDelivered

Private office build

White Rock, BC

Specialty
Commercial office
City permit authority
City of White Rock Building Division
  • Commercial office fit-out in White Rock

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in White Rock.

White Rock permits independently of Surrey despite being surrounded by it — a Surrey approval carries no weight here. The Building Division reviews against the City's Zoning Bylaw and Official Community Plan as well as the provincial construction regulations, so a use that is permitted in a neighbouring municipality still has to clear White Rock's own zoning.

White Rock's commercial space is concentrated in the uptown blocks around Johnston Road and Five Corners, with the Marine Drive strip running retail and hospitality. It is a compact market with an older population, which is why dental, denture, physiotherapy and optometry practices take up so much of the professional tenancy. Units are small and often sit above or behind retail, so servicing and access are the first questions, not the last. The city is geographically enclaved within Surrey but permits separately, under its own Building Division.

Uptown White RockFive CornersMarine DriveEast Beach

2026 range

$300–$400 per sq ft

turnkey — typically $1.4M–$1.8M for a 4,500 sq ft space

What that covers

  • Custom home planning and construction management
  • Finish, millwork, fixture, and detail coordination
  • Quality control through final walkthrough and handover

What decides this build

The finish schedule is the critical path. Stone, millwork and specialty glazing are ordered against framing dates, because a six-week lead time discovered late is a six-week delay.

Long-lead items are ordered against the framing schedule rather than at finishing stage, and the site is protected to a standard that assumes the finishes are already installed. Most damage on a high-finish build happens after the expensive material arrives.

Project review

We walk the space and price the risk before you commit to luxury residential construction. Permits and services are the two that bite.

Long-lead ordered early

Stone, custom millwork and specialty glazing are ordered against framing dates rather than at finishing stage.

Site protection

Protection is installed to a standard that assumes the finishes are already in. Most damage happens after delivery.

Questions

Frequently asked.

Does Oberizon handle luxury residential construction in White Rock?

Yes — we have delivered 2 projects in White Rock, including The Shine Dental. We run luxury residential construction across the Lower Mainland from a White Rock head office.

Who issues the building permit for luxury residential construction in White Rock?

The building permit is issued by City of White Rock Building Division, reviewed against the BC Building Code and the city's own zoning. White Rock issues a distinct Commercial Tenant Improvement permit, separate from the residential stream. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does luxury residential construction cost in White Rock?

$300–$400 per sq ft turnkey — typically $1.4M–$1.8M for a 4,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near White Rock does Oberizon serve for luxury residential construction?

Most conversations start around Uptown White Rock, Five Corners, and Marine Drive. We travel further when the scope justifies it.

What should I prepare before starting luxury residential construction in White Rock?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

What sets the schedule on a high-finish home?

The finish schedule, not the framing. Stone, custom millwork and specialty glazing carry the longest lead times, so they are ordered against framing dates rather than at finishing stage.

When does site protection start on a luxury build?

Before the expensive material arrives, and to a standard that assumes it is already installed. Most damage on a high-finish build happens after delivery, not during construction.

Can Oberizon review my White Rock space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning luxury residential construction in White Rock?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770