156 St pharmacy
#1-2233 156 St, Surrey, BC

Surrey Construction
An office renovation runs while staff are still in the building. We have two clinics in progress in Surrey right now — a pharmacy on 156 Street and a dental build on Whalley Boulevard. Surrey is a different problem from the smaller municipalities around it: the corridors are newer, the buildings are bigger, and the approval path runs through a city that processes a very high volume of commercial applications.
Experience
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Surrey runs through the same four stages.
We walk the space and price the risk before you commit to anything.
Drawings and permits go in while equipment and long-lead items are ordered.
One site lead holds the trades and calls you with progress every week.
Inspections cleared and the deficiency list closed before you take the keys.
The work
#1-2233 156 St, Surrey, BC
#111-10767 Whalley Blvd, Surrey, BC
Reviews
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Local planning
Surrey is the only municipality here that publishes a separate Medical Clinic Tenant Improvement permit, with its own three-week target. A clinic fit-out is not queued behind general commercial work. Fraser Health approval is required before the permit is issued where the space involves food handling, personal services or recreational services.
Surrey's commercial activity spreads across several distinct centres rather than one downtown — City Centre around Whalley and King George, Guildford, Fleetwood and Newton each carry their own professional and retail tenancy. Much of the healthcare space is in newer mixed-use and strata buildings, which usually means better base-building services than the older Fraser Valley stock but tighter strata rules about noise, hours and shared systems. The city has been adding population faster than almost anywhere in the province, and clinic demand has followed it into the suburban centres rather than staying downtown.
2026 range
$120–$220 per sq ft
turnkey — typically $300k–$550k for a 2,500 sq ft space
What that covers
What decides this build
Staff stay in the building, so the work is measured in decibels and dust as much as in square feet. Data cabling density is usually the item that has been under-scoped.
Acoustic separation between meeting rooms and open floor is specified at drawing stage — a partition taken to the ceiling tile instead of the deck is the single most common complaint after handover, and it cannot be fixed without reopening the ceiling.
We walk the space and price the risk before you commit to office renovation contractor. Permits and services are the two that bite.
Partitions are taken to the deck where privacy matters. Correcting that after handover means reopening the ceiling.
Data and low-voltage are counted at drawing stage rather than discovered on the day the desks arrive.
Where to go next
Questions
Yes — we have 2 projects in progress in Surrey right now, including 156 St pharmacy. We run office renovation contractor across the Lower Mainland from a White Rock head office.
The building permit is issued by City of Surrey — Building Division, reviewed against the BC Building Code and the city's own zoning. Surrey runs tenant improvements as their own permit stream and splits it three ways: minor, new and medical clinic. Review typically runs 3 business days for a minor tenant improvement and 3 weeks for a medical clinic fit-out against the city's own published targets.
$120–$220 per sq ft turnkey — typically $300k–$550k for a 2,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.
Most conversations start around City Centre, Guildford, and Fleetwood. We travel further when the scope justifies it.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Demolition, coring and anything percussive runs outside working hours, and finishing trades run during the day behind sealed hoardings. The programme is built around the tenancy's quiet hours rather than the trades' preference.
Data and low-voltage density, and acoustic separation. Partitions stopped at the ceiling tile rather than the deck are the most common post-handover complaint, and correcting them means reopening the ceiling.
Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.
Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.