Oberizon Construction
Dental operatory with chair, overhead light and service cabinetry

Surrey Construction

Clinic Renovation Contractor in Surrey, BC

Renovating a working clinic means the practice keeps seeing patients throughout. We have two clinics in progress in Surrey right now — a pharmacy on 156 Street and a dental build on Whalley Boulevard. Surrey is a different problem from the smaller municipalities around it: the corridors are newer, the buildings are bigger, and the approval path runs through a city that processes a very high volume of commercial applications.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Surrey runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered near Surrey.

PharmacyIn progress

156 St pharmacy

156 Street, Surrey, BC

Specialty
Pharmacy
Size
1,500 sq ft
City permit authority
City of Surrey — Building Division
  • 1,500 sq ft pharmacy tenant improvement
  • Planning, building permit, millwork, plumbing, electrical and mechanical
  • Flooring, lighting and washrooms
  • In progress on 156 Street
Dental clinicIn progress

Flamingo Dental Clinic

Unit 111, 10767 Whalley Boulevard, Surrey, BC

Specialty
Dental clinic
Size
1,158 sq ft
City permit authority
City of Surrey — Building Division
  • 1,158 sq ft dental fit-out in Whalley, Surrey
  • Three operatories
  • One future operatory roughed in at a consult room
Read the case study

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Surrey.

Surrey is the only municipality here that publishes a separate Medical Clinic Tenant Improvement permit, with its own three-week target. A clinic fit-out is not queued behind general commercial work. Fraser Health approval is required before the permit is issued where the space involves food handling, personal services or recreational services.

Surrey's commercial activity spreads across several distinct centres rather than one downtown — City Centre around Whalley and King George, Guildford, Fleetwood and Newton each carry their own professional and retail tenancy. Much of the healthcare space is in newer mixed-use and strata buildings, which usually means better base-building services than the older Fraser Valley stock but tighter strata rules about noise, hours and shared systems. The city has been adding population faster than almost anywhere in the province, and clinic demand has followed it into the suburban centres rather than staying downtown.

City CentreGuildfordFleetwoodNewton

2026 range

$120–$240 per sq ft

turnkey — typically $240k–$480k for a 2,000 sq ft space

What that covers

  • Clinic assessment and phasing
  • Service, finish, equipment, and patient-flow coordination
  • Deficiency management and reopening support

What decides this build

Construction happens inside a live clinic. Medical and physio and chiro and optometry and veterinary renovations keep the practice open in zones. Barriers and negative air go in before demolition.

Hoardings and negative air go in before demolition. Staff and patient routes are agreed in writing. CSA Z317.13 and IPAC practice apply while the clinic stays open. They do not wait for handover.

Project review

We walk the space and price the risk before you commit to clinic renovation contractor. Permits and services are the two that bite.

Barriers before demolition

Hoardings and negative air go in first. IPAC expectations and CSA Z317.13 apply during the work. They do not wait for handover.

Separated circulation

The construction route is agreed with the practice in writing before the first wall is opened.

Where to go next

Also built in Surrey.

Commercial Contractors in SurreyPermits, delivered work and every service we run in Surrey.Medical clinic construction in SurreyA new medical clinic. This page is the renovation.Commercial ConstructionChoose this if you need to hire a commercial construction company with clear scope, budget, and schedule control.Commercial RenovationChoose this if you need to renovate an active or upcoming business space without losing control of schedule or cost.Office Renovation ContractorChoose this if you need to renovate or build an office that supports staff flow, client experience, and daily operation.Healthcare ConstructionChoose this if you need to build a healthcare space where services, permits, patient flow, and handover cannot be improvised.Clinic Renovation Contractor in White RockWhite Rock is an enclave inside Surrey with its own Building Division, and our office is there — start there if your address is on the peninsula.All service areasCompare how Oberizon works across the Lower Mainland.All Clinic Renovation ContractorSee the full service, pricing and every city we build it in.Estimate your buildSet your own square footage and see the range.Clinic Renovation Contractor in VancouverThe Vancouver page. This page stays on Surrey.Clinic Renovation Contractor in AbbotsfordThe Abbotsford page. This page stays on Surrey.Clinic Renovation Contractor in LangleyThe Langley page. This page stays on Surrey.Clinic Renovation Contractor in BurnabyThe Burnaby page. This page stays on Surrey.Clinic Renovation Contractor in RichmondThe Richmond page. This page stays on Surrey.Clinic Renovation Contractor in CoquitlamThe Coquitlam page. This page stays on Surrey.Clinic Renovation Contractor in White RockThe White Rock page. This page stays on Surrey.Clinic Renovation Contractor in ChilliwackThe Chilliwack page. This page stays on Surrey.

Questions

Frequently asked.

Does Oberizon handle clinic renovation contractor in Surrey?

Yes — we have 2 projects in progress in Surrey right now, including 156 St pharmacy. We run clinic renovation contractor across the Lower Mainland from a White Rock head office.

Who issues the building permit for clinic renovation contractor in Surrey?

The building permit is issued by City of Surrey — Building Division, reviewed against the BC Building Code and the city's own zoning. Surrey runs tenant improvements as their own permit stream and splits it three ways: minor, new and medical clinic. Review typically runs 3 business days for a minor tenant improvement and 3 weeks for a medical clinic fit-out against the city's own published targets.

How much does a clinic renovation cost in Surrey?

$120–$240 per sq ft turnkey — typically $240k–$480k for a 2,000 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Surrey does Oberizon serve for clinic renovation contractor?

Most conversations start around City Centre, Guildford, and Fleetwood. We travel further when the scope justifies it.

What should I prepare before starting clinic renovation contractor in Surrey?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

How is infection control handled while a clinic is under construction?

Hoardings and negative air go in before demolition. A construction route stays off the patient path. IPAC practice and CSA Z317.13 apply during the work. They do not wait for handover.

Can you renovate a clinic while it stays open?

Yes. Oberizon Construction phases medical and physio and chiro and optometry and veterinary renovations in zones. One part of the clinic keeps seeing patients. The disruptive work runs outside those hours.

Can you renovate a clinic in Surrey while it stays open?

Yes. Oberizon Construction phases a clinic renovation in Surrey behind IPAC barriers. CSA Z317.13 infection-control practice applies while one zone stays open. The route is agreed before demolition.

Can Oberizon review my Surrey space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning a clinic renovation in Surrey?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770