Oberizon Construction
Reception and waiting area at The Shine Dental, White Rock, BC

Surrey Construction

Medical Clinic Construction in Surrey

A medical clinic is exam rooms and a circulation path. Surrey publishes a Medical Clinic Tenant Improvement stream with a 3-week target. A general new tenant improvement is about 10 weeks. We have no delivered medical clinic here to name.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Surrey runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Surrey.

Surrey is the only municipality here that publishes a separate Medical Clinic Tenant Improvement permit, with its own three-week target. A clinic fit-out is not queued behind general commercial work. Fraser Health approval is required before the permit is issued where the space involves food handling, personal services or recreational services.

Surrey's commercial activity spreads across several distinct centres rather than one downtown — City Centre around Whalley and King George, Guildford, Fleetwood and Newton each carry their own professional and retail tenancy. Much of the healthcare space is in newer mixed-use and strata buildings, which usually means better base-building services than the older Fraser Valley stock but tighter strata rules about noise, hours and shared systems. The city has been adding population faster than almost anywhere in the province, and clinic demand has followed it into the suburban centres rather than staying downtown.

City CentreGuildfordFleetwoodNewton

2026 range

$150–$260 per sq ft

turnkey — typically $375k–$650k for a 2,500 sq ft space

What that covers

  • Exam room, reception, and support-area planning
  • Privacy, services, finishes, and daily-use details
  • Construction management through inspection and handover

What decides this build

Oberizon builds family and specialist medical clinics. Exam rooms and intake and staff circulation are named before Fraser Health review. Renaming a room after the permit is a redesign.

Room naming is fixed with the practice before the drawings are sealed, because a procedure room, an exam room and a treatment room carry different air-change and clearance expectations under health authority review.

Project review

We walk the space and price the risk before you commit to medical clinic construction. Permits and services are the two that bite.

Room naming fixed early

Exam, treatment and procedure rooms carry different requirements. The names are agreed before the drawing set is sealed.

Health authority review

Fraser Health or Vancouver Coastal Health depending on the address, confirmed before drawings start rather than after.

How a Surrey medical clinic is built

Medical clinic construction in Surrey starts with the city's own streams. The City of Surrey Building Division publishes a Medical Clinic Tenant Improvement target of 3 weeks and a new tenant improvement target of about 10 weeks. The clock starts on a complete application. The 3-week figure is review time. It is not the construction duration.

Design is often 6 to 12 weeks. Permits are often 6 to 16 weeks. Construction for a typical clinic is about 10 to 16 weeks after the permit. The published band is $150–$260 per square foot. It is not a Surrey price. Fraser Health is the health authority.

This cost guide is not the page to hire from. The construction page is this one. A blog that prices the work by the square foot is a guide. It does not replace the Surrey permit path or the room list.

There is no delivered Oberizon medical clinic in Surrey. Flamingo Dental Clinic at Unit 111, 10767 Whalley Boulevard is a dental fit-out of 1,158 sq ft. It is in progress. A pharmacy on 156 Street is 1,500 sq ft and in progress. Neither is a medical clinic. The service page is medical clinic construction. A leased shell is a medical clinic fit-out. A rehab floor is physiotherapy clinic construction. Dental firms are compared on dental office construction companies.

Surrey is not White Rock

White Rock is an enclave inside Surrey with its own Building Division. The office is Suite 305, 1493 Foster Street in White Rock. A White Rock medical clinic is a different page. This page is Surrey.

Flamingo Dental Clinic on Whalley Boulevard is a dental fit-out in progress. It is 1,158 sq ft. It is not a medical clinic. The pharmacy on 156 Street is a pharmacy. It is not medical proof for this page.

Exam rooms rather than dental chairs

Medical clinic construction in Surrey is a set of exam rooms and the circulation that connects them. It is not a row of dental chairs. There is no dental vacuum and no compressed-air trunk to a dental unit. If the practice is medical the drawings say exam and consult and staff work. They do not say operatory.

Patients need a path from the entry to reception to waiting and into a room without walking through soiled holding. Staff need a path for clean supplies that does not cross that waiting room. City Centre towers and Guildford commercial floors and Newton street units do not share a shape. The path is redrawn for the bay you leased. A copied plan from a wider clinic will not fit a narrow one.

Room names are fixed with the practice before the set is sealed. An exam room and a procedure room are reviewed differently. Changing the name after the permit is a redesign. Accessibility at the entry and the washroom is in the same package. It is not a note added at the end.

Surrey's medical-clinic stream

Surrey publishes a Medical Clinic Tenant Improvement stream. The city's target is 3 weeks. A general new tenant improvement is about 10 weeks. Those are published targets. The clock starts when the application is complete and accurate. They are the reason a Surrey medical file is not the same queue as a plain office fit-out.

The stream is for a medical clinic. It is not a dental category and we do not describe it as one. A dental practice confirms its own stream with the city. This page stays on the medical stream Surrey actually publishes. Fraser Health is the health authority south of the North Shore. The health-authority review and the building permit are different approvals. We do not collapse them into one stamp.

The landlord approves the drawings before the application goes in. Strata commercial floors add hours and shared risers. A medical clinic often needs more plumbing than the office it replaces. Sinks and washrooms and sometimes a soiled holding room are the scope that surprises a landlord who priced an office partition job.

How the suite has to work

Reception needs a line of sight to the entry and a place for a private conversation that is not the waiting room. The waiting seats should not face a screen full of names. Staff workrooms sit off the clinical path. A break room is not a sterile store. Those are design decisions with construction consequences because they move walls and plumbing.

Finishes follow the use. Exam rooms want cleanable surfaces and light that is honest about skin and tissue. Waiting rooms can be calmer. Wet rooms get a floor that can be washed. We do not specify a brand on this page. We specify the duty. The construction page is where the build is priced. This city page is where the Surrey permit and the room list meet.

Phasing matters when a practice is already in the building. A new clinic in an empty unit is a straight build. A group taking over an old office may need a weekend switch of the entry and the washroom. The zone plan is written if people are in the suite. It is omitted only when the unit is empty and the landlord agrees the whole floor is yours.

No delivered medical clinic to name

There is no delivered Oberizon medical clinic to name in Surrey or in Vancouver. The dental clinics we can photograph are The Shine Dental in White Rock and the Marshall Road clinic at 104-33069 Marshall Road in Abbotsford. Two dental clinics are in progress at #B115 and #E100, 8100 272 Street in Langley. They are dental. They are not medical proof for this page. We will not assign any other clinic to Surrey to fill the gap.

Medical clinic construction is published at $150–$260 per square foot across the Lower Mainland. It is not a Surrey price. Design is often 6–12 weeks. Permits are often 6–16 weeks. Construction for a typical clinic is about 10–16 weeks after permits. The 3-week figure above is Surrey's review target for the medical stream. It is not the construction duration.

Bring the address and the exam-room count and whether the unit is empty. We will tell you which permit stream the city publishes for a medical clinic and what has to be drawn before the application. Interior design of those rooms is its own page. Construction scope stays here.

Where to go next

Also built in Surrey.

Commercial Contractors in SurreyPermits, delivered work and every service we run in Surrey.Clinic renovation contractor in SurreyA medical office renovation while the practice stays open. This page is the new clinic build.Commercial ConstructionChoose this if you need to hire a commercial construction company with clear scope, budget, and schedule control.Commercial RenovationChoose this if you need to renovate an active or upcoming business space without losing control of schedule or cost.Office Renovation ContractorChoose this if you need to renovate or build an office that supports staff flow, client experience, and daily operation.Healthcare ConstructionChoose this if you need to build a healthcare space where services, permits, patient flow, and handover cannot be improvised.Medical Clinic Construction in White RockWhite Rock is an enclave inside Surrey with its own Building Division, and our office is there — start there if your address is on the peninsula.All service areasCompare how Oberizon works across the Lower Mainland.All Medical Clinic ConstructionSee the full service, pricing and every city we build it in.Estimate your buildSet your own square footage and see the range.Medical Clinic Construction in VancouverThe Vancouver page. This page stays on Surrey.Medical Clinic Construction in AbbotsfordThe Abbotsford page. This page stays on Surrey.Medical Clinic Construction in LangleyThe Langley page. This page stays on Surrey.Medical Clinic Construction in BurnabyThe Burnaby page. This page stays on Surrey.Medical Clinic Construction in RichmondThe Richmond page. This page stays on Surrey.Medical Clinic Construction in CoquitlamThe Coquitlam page. This page stays on Surrey.Medical Clinic Construction in White RockThe White Rock page. This page stays on Surrey.Medical Clinic Construction in ChilliwackThe Chilliwack page. This page stays on Surrey.Medical clinic interior designExam rooms, reception, staff flow and finishes. Construction stays on the medical clinic page.Dental millwork and cabinetryReception desks, sterilization cabinetry and operatory casework on one page.Dental equipment and plumbingChair location drives the rough-in for vacuum, air and the drain.X-ray room shieldingShielding is drawn before the walls close.Operatory plumbing and vacuumVacuum, compressed air and a dedicated drain for each chair.Dental clinic permits in BCThe college registers the dentist. The municipality issues the building permit.Buying or starting a practiceA purchase may still need a renovation. A start is a shell.Dental office floor plansPlanning layouts for reception, sterilization, operatories and the mechanical room.

Questions

Frequently asked.

What is Surrey's Medical Clinic Tenant Improvement stream?

Surrey publishes it as its own permit stream. The target is 3 weeks. A general new tenant improvement is about 10 weeks. The clock starts on a complete application. The target is review time. It is not the construction schedule.

What does medical clinic construction cost in Surrey?

The published Lower Mainland band is $150–$260 per square foot. It is not a Surrey price. Exam room count and accessibility move a job inside the band.

Is a Surrey medical clinic a dental chair layout?

No. The rooms are exam rooms and the circulation between them. Dental vacuum and dental chairs belong on the dental pages. Fraser Health is the health authority south of the North Shore.

Do you have a delivered medical clinic in Surrey to show?

No. There is no delivered medical clinic to name on this page. The City of Surrey issues the building permit. We confirm the medical stream from the city's own categories.

Planning medical clinic construction in Surrey?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770