Fit-out

Medical Clinic Fit-Out

A medical clinic fit-out is the interior of a leased suite. Exam rooms, intake and staff circulation are built into a shell that already exists. The same work is also called a medical clinic fit out.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

What the fit-out includes

Partitions, plumbing for washrooms and exam-room sinks, power, ventilation, cleanable finishes and the inspections that reach occupancy. Reception sees the entry. Staff supplies do not cross the waiting room. Room names are fixed before the permit set is sealed. An exam room and a procedure room are not the same label.

The published band is $150–$260 per square foot. It covers the Lower Mainland. It is not a price for one city. Equipment, furniture and IT sit outside it. The contractor page for the whole build is medical clinic construction.

Permits in Vancouver and Surrey

Medical clinic construction in Vancouver is permitted by the City of Vancouver under the Vancouver Building By-law. The office Tenant Improvement Program is for office tenants. A clinic does not use it. Fraser Health is the health authority south of the North Shore.

Medical clinic construction in Surrey can use the city's Medical Clinic Tenant Improvement stream. The published target is 3 weeks. A general new tenant improvement is about 10 weeks. The clock starts when the application is complete. That target is review time. It is not how long the fit-out takes to build.

Projects we can name

There is no delivered Oberizon medical clinic to name. A pharmacy tenant improvement on 156 Street in Surrey is in progress at 1,500 sq ft. It is a pharmacy. Flamingo Dental Clinic in Whalley is a 1,158 sq ft dental fit-out in progress. The Shine Dental is a delivered dental clinic in White Rock. Skinholic Aesthetics is a delivered med spa in Abbotsford. None of those is a medical clinic fit-out and we do not label them as one.

The office is Suite 305, 1493 Foster Street, White Rock, BC V4B 0C4. Hours are Monday to Friday, 9:00 AM to 6:00 PM. The phone is (604) 385-3770.

Questions

Frequently asked.

What is a medical clinic fit-out?

It is the tenant improvement that turns a leased suite into exam rooms, intake and staff circulation. The municipality issues the building permit. The published band is $150–$260 per square foot across the Lower Mainland.

Is a medical clinic fit out different from medical clinic construction?

The fit-out is the interior of an existing shell. Medical clinic construction is the contractor page for the whole build, including a relocated clinic. Both use the same $150–$260 per square foot band. Equipment is separate.

How long does a medical clinic fit-out take?

Design is often 6 to 12 weeks. Permits are often 6 to 16 weeks. Construction for a typical clinic is about 10 to 16 weeks after the building permit. Surrey publishes a 3-week review target for a medical clinic tenant improvement. That target is review time. It is not the construction duration.

Who permits a medical clinic fit-out in Vancouver?

The City of Vancouver issues the building permit under the Vancouver Building By-law. The office Tenant Improvement Program does not cover a clinic. Fraser Health is the health authority south of the North Shore.

Planning a medical clinic?

Bring the address and whether the suite is empty. We will say which permit stream applies and what has to be drawn before construction starts.