Oberizon Construction
Glass-walled operatory corridor in a completed dental clinic

New Westminster Construction

Clinic Renovation Contractor in New Westminster, BC

Renovating a working clinic means the practice keeps seeing patients throughout. We plan that before the site gets busy. Drawings, permits and trades are sequenced by one team out of White Rock.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near New Westminster runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in New Westminster.

Oberizon works across the Lower Mainland, including New Westminster's historic and high-density commercial areas. Every project is planned around site access, inspection windows and how the finished space has to run.

New Westminster work is shaped by older building conditions, healthcare tenancy. We use that to set scope and sequence before demolition starts.

UptownDowntownSappertonQueensborough

2026 range

$120–$240 per sq ft

turnkey — typically $240k–$480k for a 2,000 sq ft space

What that covers

  • Clinic assessment and phasing
  • Service, finish, equipment, and patient-flow coordination
  • Deficiency management and reopening support

What decides this build

Construction happens inside a live clinic. Medical and physio and chiro and optometry and veterinary renovations keep the practice open in zones. Barriers and negative air go in before demolition.

Hoardings and negative air go in before demolition. Staff and patient routes are agreed in writing. CSA Z317.13 and IPAC practice apply while the clinic stays open. They do not wait for handover.

Project review

We walk the space and price the risk before you commit to clinic renovation contractor. Permits and services are the two that bite.

Barriers before demolition

Hoardings and negative air go in first. IPAC expectations and CSA Z317.13 apply during the work. They do not wait for handover.

Separated circulation

The construction route is agreed with the practice in writing before the first wall is opened.

Questions

Frequently asked.

Does Oberizon handle clinic renovation contractor in New Westminster?

Yes. We run clinic renovation contractor across the Lower Mainland from our White Rock head office, and that includes New Westminster's historic and high-density commercial areas. Tell us the address and we will walk the space before you commit to anything.

Who issues the building permit for clinic renovation contractor in New Westminster?

New Westminster issues its own building permit, reviewed against the BC Building Code and the city's zoning bylaw, and the route differs from neighbouring municipalities. We confirm the current requirements with the city at the start of every job rather than working from the last one.

How much does a clinic renovation cost in New Westminster?

$120–$240 per sq ft turnkey — typically $240k–$480k for a 2,000 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near New Westminster does Oberizon serve for clinic renovation contractor?

Most conversations start around Uptown, Downtown, and Sapperton. We travel further when the scope justifies it.

What should I prepare before starting clinic renovation contractor in New Westminster?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

How is infection control handled while a clinic is under construction?

Hoardings and negative air go in before demolition. A construction route stays off the patient path. IPAC practice and CSA Z317.13 apply during the work. They do not wait for handover.

Can you renovate a clinic while it stays open?

Yes. Oberizon Construction phases medical and physio and chiro and optometry and veterinary renovations in zones. One part of the clinic keeps seeing patients. The disruptive work runs outside those hours.

Can you renovate a clinic in New Westminster while it stays open?

Yes. Oberizon Construction phases a clinic renovation in New Westminster behind IPAC barriers. CSA Z317.13 infection-control practice applies while one zone stays open. The route is agreed before demolition.

Can Oberizon review my New Westminster space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning a clinic renovation in New Westminster?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770