Project review
We walk the space and price the risk before you commit to clinic renovation contractor. Permits and services are the two that bite.

Tri-Cities Construction
Renovating a working clinic means the practice keeps seeing patients throughout. We plan that before the site gets busy. Drawings, permits and trades are sequenced by one team out of White Rock.
Experience
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Tri-Cities runs through the same four stages.
We walk the space and price the risk before you commit to anything.
Drawings and permits go in while equipment and long-lead items are ordered.
One site lead holds the trades and calls you with progress every week.
Inspections cleared and the deficiency list closed before you take the keys.
Reviews
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Local planning
Oberizon works across the Lower Mainland, including Coquitlam and the Port Moody corridor. Every project is planned around site access, inspection windows and how the finished space has to run.
Tri-Cities work is shaped by rapid growth, family healthcare demand. We use that to set scope and sequence before demolition starts.
2026 range
$120–$240 per sq ft
turnkey — typically $240k–$480k for a 2,000 sq ft space
What that covers
What decides this build
Construction happens inside a live clinical environment, so infection control governs the site, not just the finished space. Barriers, negative air and route separation are part of the build, not the cleanup.
Hoardings, negative air machines and a separated construction route go in before demolition starts, and staff and patient circulation is agreed with the practice in writing. IPAC expectations apply to the site during the work, not only to the space at handover.
We walk the space and price the risk before you commit to clinic renovation contractor. Permits and services are the two that bite.
Hoardings and negative air go in first. IPAC expectations apply to the site during the work, not only to the finished space.
The construction route is agreed with the practice in writing before the first wall is opened.
Where to go next
Questions
Yes. We run clinic renovation contractor across the Lower Mainland from our White Rock head office, and that includes Coquitlam and the Port Moody corridor. Tell us the address and we will walk the space before you commit to anything.
Tri-Cities issues its own building permit, reviewed against the BC Building Code and the city's zoning bylaw, and the route differs from neighbouring municipalities. We confirm the current requirements with the city at the start of every job rather than working from the last one.
$120–$240 per sq ft turnkey — typically $240k–$480k for a 2,000 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.
Most conversations start around Port Moody, Port Coquitlam, and Coquitlam Centre. We travel further when the scope justifies it.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Hoardings, negative air machines and a construction route separated from patient circulation go in before demolition. IPAC expectations apply to the site during the work, not only to the finished space.
Yes. The clinic is divided into zones and the disruptive work is scheduled outside clinical hours, with the route between them agreed with the practice in writing before the first barrier goes up.
Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.
Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.