Project review
We walk the space and price the risk before you commit to commercial construction. Permits and services are the two that bite.

Coquitlam Construction
A commercial build is won or lost on the permit sequence, long before anyone breaks ground. We plan that before the site gets busy. Drawings, permits and trades are sequenced by one team out of White Rock.
Experience
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Coquitlam runs through the same four stages.
We walk the space and price the risk before you commit to anything.
Drawings and permits go in while equipment and long-lead items are ordered.
One site lead holds the trades and calls you with progress every week.
Inspections cleared and the deficiency list closed before you take the keys.
Reviews
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Local planning
Oberizon works across the Lower Mainland, including Coquitlam and the northeast Metro Vancouver market. Every project is planned around site access, inspection windows and how the finished space has to run.
Coquitlam work is shaped by mixed-use growth, clinic demand. We use that to set scope and sequence before demolition starts.
2026 range
$120–$220 per sq ft
turnkey — typically $300k–$550k for a 2,500 sq ft space
What that covers
What decides this build
A ground-up commercial build is a servicing problem before it is a building problem. Power, water and storm capacity to the lot decide the schedule long before anyone prices drywall.
We confirm the service capacity at the property line before pricing the build. An upgrade to the transformer or the water service runs on the utility's timeline rather than the site's. No amount of crew recovers those weeks once they are lost.
We walk the space and price the risk before you commit to commercial construction. Permits and services are the two that bite.
Capacity at the property line is verified before the price is fixed. A utility upgrade is a timeline nobody on site can compress.
Development permit, building permit and servicing agreements run alongside each other wherever the municipality allows it.
Where to go next
Questions
Yes. We run commercial construction across the Lower Mainland from our White Rock head office, and that includes Coquitlam and the northeast Metro Vancouver market. Tell us the address and we will walk the space before you commit to anything.
Coquitlam issues its own building permit, reviewed against the BC Building Code and the city's zoning bylaw, and the route differs from neighbouring municipalities. We confirm the current requirements with the city at the start of every job rather than working from the last one.
$120–$220 per sq ft turnkey — typically $300k–$550k for a 2,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.
Most conversations start around Town Centre, Austin Heights, and Burquitlam. We travel further when the scope justifies it.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Servicing capacity at the property line. Power, water and storm have to carry the finished building, and a utility upgrade runs on the utility's timeline rather than the site's — which is why we confirm it before pricing rather than during construction.
Electrical capacity, make-up air and the condition of anything being kept. A fixed price given without verifying those is a fixed price with a change order already in it.
Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.
Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.