Oberizon Construction
Dental operatory with chair, overhead light and service cabinetry

Vancouver Construction

Veterinary Clinic Construction in Vancouver

Oberizon Construction plans veterinary clinics in Vancouver from a White Rock office. Washdown finishes, kennel acoustics and species-separated waiting are the scope a human clinic does not have. The College of Veterinarians of BC accredits the facility. The City of Vancouver issues the building permit. There is no published Oberizon veterinary clinic.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Vancouver runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Vancouver.

Vancouver runs a Tenant Improvement Program for office tenants in eligible buildings, which removes the need for a new development permit and gives an expedited field review. Any commercial office building permitted after 31 January 2007 is on that list automatically. The programme covers office work rather than clinical fit-outs, so a medical or dental build follows the standard building permit route.

Vancouver's professional and clinical tenancy is spread thin across the city — Cambie and Mount Pleasant carry a lot of the medical and dental space, Kitsilano and the West Side run smaller practices, and downtown is mostly office and retail. Buildings are older and denser than anywhere else in the region, and a large share of commercial space is strata-owned, which adds an approval layer before the city is even involved. Access is the recurring cost: limited loading, restricted work hours in mixed residential buildings, and material handling that has to be scheduled rather than assumed.

Mount PleasantKitsilanoCambieDowntown

2026 range

Price varies by scope, finish level, and site conditions.

What that covers

  • Washdown floors, coved bases and floor drains
  • Acoustic separation around kennels and wards
  • Species-separated waiting and surgery gas scavenging

What decides this build

Washdown floors and floor drains are the scope a human clinic does not have. Acoustic isolation around the kennel is the other one. Zoning for animal care is checked before the lease is firm.

Floor drains and washdown finishes are a lease question. Adding them on an upper floor can be impossible. Kennel walls have to stop sound reaching the suite next door. The College of Veterinarians of BC accredits the facility. The city issues the building permit.

Project review

We walk the space and price the risk before you commit to veterinary clinic construction. Permits and services are the two that bite.

Drains before the lease

Washdown areas need floor drains. An upper-floor slab that cannot take them is the wrong building.

Kennel acoustics

Ward walls and doors are acoustic assemblies. Ducts are routed so they do not carry barking into the next suite.

What a Vancouver veterinary fit-out adds

Exam rooms, surgery, imaging and sterilization transfer from human clinic construction. The veterinary quarter is floor drains, washdown finishes, acoustic isolation around kennels and a waiting room that separates species. Adding drains on an upper floor can be impossible. That is a lease question before it is a drawing.

Veterinary builds sit toward the intensive end of the healthcare band, $150–$320 per sq ft. The band is Lower Mainland-wide. It is not a Vancouver price. Zoning for animal care is checked before the lease is firm.

Who approves the Vancouver clinic

The City of Vancouver issues the building permit under the Vancouver Building By-law. The College of Veterinarians of BC accredits the facility. There is no Fraser Health clinical review of the kind a human clinic receives. The office Tenant Improvement Program does not cover a veterinary clinic.

Questions

Frequently asked.

Do you build veterinary clinics in Vancouver?

Yes. Oberizon Construction plans veterinary clinics in Vancouver from a White Rock office. The College of Veterinarians of BC accredits the facility and the City of Vancouver issues the building permit. Call (604) 385-3770.

Is there a published veterinary clinic in Vancouver?

No. There is no published Oberizon veterinary project. The healthcare band of $150–$320 per sq ft is the pointer. It is not a Vancouver price.

Does Oberizon handle veterinary clinic construction in Vancouver?

Yes — we have delivered a project in Vancouver, including West Cordova residential build. We run veterinary clinic construction across the Lower Mainland from a White Rock head office.

Who issues the building permit for veterinary clinic construction in Vancouver?

The building permit is issued by City of Vancouver — Development and Building Services Centre, reviewed against the Vancouver Building By-law and the city's own zoning. Vancouver permits under its own Vancouver Building By-law rather than the BC Building Code and runs a Tenant Improvement Program for office tenants in eligible buildings. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does veterinary clinic construction cost in Vancouver?

Price varies by scope, finish level, and site conditions.. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Vancouver does Oberizon serve for veterinary clinic construction?

Most conversations start around Mount Pleasant, Kitsilano, and Cambie. We travel further when the scope justifies it.

What should I prepare before starting veterinary clinic construction in Vancouver?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

How much does veterinary clinic construction cost?

Veterinary builds sit toward the intensive end of healthcare construction. That published band is $150–$320 per sq ft. Drains and washdown finishes and kennel acoustics push a job up the band.

Who approves a veterinary clinic in BC?

The municipality issues the building permit. The College of Veterinarians of BC accredits the facility. Animal-care zoning is checked before the lease is firm. Boarding narrows the zones that work.

Can Oberizon review my Vancouver space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning a veterinary clinic in Vancouver?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770