Oberizon Construction
Glass-walled operatory corridor in a completed dental clinic

Vancouver Construction

Optometry Clinic Construction in Vancouver

Oberizon Construction plans optometry and eye clinics in Vancouver from a White Rock office. Exam lanes and the optical dispensary are one floor. Vancouver reviews the work under the Vancouver Building By-law. There is no published Oberizon optometry clinic.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Vancouver runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Vancouver.

Vancouver runs a Tenant Improvement Program for office tenants in eligible buildings, which removes the need for a new development permit and gives an expedited field review. Any commercial office building permitted after 31 January 2007 is on that list automatically. The programme covers office work rather than clinical fit-outs, so a medical or dental build follows the standard building permit route.

Vancouver's professional and clinical tenancy is spread thin across the city — Cambie and Mount Pleasant carry a lot of the medical and dental space, Kitsilano and the West Side run smaller practices, and downtown is mostly office and retail. Buildings are older and denser than anywhere else in the region, and a large share of commercial space is strata-owned, which adds an approval layer before the city is even involved. Access is the recurring cost: limited loading, restricted work hours in mixed residential buildings, and material handling that has to be scheduled rather than assumed.

Mount PleasantKitsilanoCambieDowntown

2026 range

$150–$260 per sq ft

turnkey — typically $300k–$520k for a 2,000 sq ft space

What that covers

  • Exam lanes set to the refraction method
  • Optical dispensary millwork and lighting
  • Pre-test rooms and equipment rough-in

What decides this build

Lane lighting has to dim from the chair. Windows in an exam lane fight the refraction. Give the glazing to the dispensary and the reception.

The refraction method sets the lane length before the floor plan is frozen. A mirror system fits a lane in about 10 to 12 feet. A true 20-foot lane does not fit a standard retail depth.

Project review

We walk the space and price the risk before you commit to optometry clinic construction. Permits and services are the two that bite.

Lane length first

The refraction method sets how long each lane is. Mirror systems are what let several lanes fit a retail depth.

Dispensary as retail

Frame displays and lighting are millwork. They are often the most expensive room per square foot in the suite.

Lanes and the dispensary

The refraction method sets the lane length before the floor plan is frozen. A mirror system fits a lane in about 10 to 12 feet. A true 20-foot lane does not fit a standard retail depth. The dispensary takes the glazing. The lanes should be able to dim.

The published band is $150–$260 per sq ft, the same as medical clinic construction. A 2,000 sq ft practice is about $300,000–$520,000 before ophthalmic equipment and frames. That figure is the optometry guide on this site. It is not a Vancouver price.

Permits in the City of Vancouver

The City of Vancouver issues the building permit under the Vancouver Building By-law. An optometry clinic does not qualify for the office Tenant Improvement Program. Equipment rough-in for pre-test rooms is drawn with the lanes.

Questions

Frequently asked.

Do you build optometry clinics in Vancouver?

Yes. Oberizon Construction is a White Rock, BC general contractor and plans optometry clinics in Vancouver from that office. Lane length is set by the refraction method before the floor plan is frozen. Call (604) 385-3770.

Does Oberizon handle optometry clinic construction in Vancouver?

Yes — we have delivered a project in Vancouver, including West Cordova residential build. We run optometry clinic construction across the Lower Mainland from a White Rock head office.

Who issues the building permit for optometry clinic construction in Vancouver?

The building permit is issued by City of Vancouver — Development and Building Services Centre, reviewed against the Vancouver Building By-law and the city's own zoning. Vancouver permits under its own Vancouver Building By-law rather than the BC Building Code and runs a Tenant Improvement Program for office tenants in eligible buildings. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does optometry clinic construction cost in Vancouver?

$150–$260 per sq ft turnkey — typically $300k–$520k for a 2,000 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Vancouver does Oberizon serve for optometry clinic construction?

Most conversations start around Mount Pleasant, Kitsilano, and Cambie. We travel further when the scope justifies it.

What should I prepare before starting optometry clinic construction in Vancouver?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

How much does optometry clinic construction cost?

An optometry clinic runs $150–$260 per sq ft turnkey. A 2,000 sq ft practice is about $300,000 to $520,000 before equipment and frames. The dispensary millwork pushes a job up the band.

What sets the floor plan of an eye clinic?

The refraction method. A mirror system fits a lane in about 10 to 12 feet. A true 20-foot lane rarely fits a retail depth. Confirm it with the equipment supplier before the walls are drawn.

Can Oberizon review my Vancouver space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning an optometry clinic in Vancouver?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770