Oberizon Construction
Slatted timber ceiling above the reception at The Shine Dental, White Rock, BC

Vancouver Construction

Tenant Improvement Contractor in Vancouver

Oberizon Construction is a tenant improvement contractor in Vancouver, working from a White Rock office. The landlord approves the drawings before the city application. Vancouver permits under the Vancouver Building By-law. The recorded Vancouver project is a house on West Cordova. It is a house. It is not a tenant improvement.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Vancouver runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond

Local planning

How it runs in Vancouver.

Vancouver runs a Tenant Improvement Program for office tenants in eligible buildings, which removes the need for a new development permit and gives an expedited field review. Any commercial office building permitted after 31 January 2007 is on that list automatically. The programme covers office work rather than clinical fit-outs, so a medical or dental build follows the standard building permit route.

Vancouver's professional and clinical tenancy is spread thin across the city — Cambie and Mount Pleasant carry a lot of the medical and dental space, Kitsilano and the West Side run smaller practices, and downtown is mostly office and retail. Buildings are older and denser than anywhere else in the region, and a large share of commercial space is strata-owned, which adds an approval layer before the city is even involved. Access is the recurring cost: limited loading, restricted work hours in mixed residential buildings, and material handling that has to be scheduled rather than assumed.

Mount PleasantKitsilanoCambieDowntown

2026 range

The commercial renovation band is the pointer: $95–$180 per sq ft

turnkey — typically $240k–$450k for a 2,500 sq ft space. A clinic fit-out is priced on its own page.

What that covers

  • Landlord drawing approval before the permit application
  • Base-building service checks before pricing
  • Construction sequenced to the city's tenant-improvement route

What decides this build

The landlord signs the drawings before the city sees them. Base-building power and make-up air are checked before the price is fixed.

We verify electrical capacity and make-up air before pricing. A shortfall found after demolition is what turns a tenant improvement into a change order.

Project review

We walk the space and price the risk before you commit to tenant improvement contractor. Permits and services are the two that bite.

Managed execution

One team holds the trades, the inspections and the deficiency list. You get one number to call.

Business operation

Reception, storage and customer flow are set against your opening date. The build is sequenced to protect it.

What a Vancouver tenant improvement includes

A tenant improvement is the interior of a leased suite. Partitions, services, finishes and the inspections that reach occupancy. Clinic fit-outs add plumbing and equipment rough-in that a plain office does not. Those clinic scopes stay on the clinic pages. This page is the contractor role and the Vancouver permit path.

The commercial renovation band is the pointer for a non-clinical interior: $95–$180 per sq ft. It is not a Vancouver price. Access, strata hours and older base buildings are why Vancouver sits at the top of a range. We verify electrical capacity and make-up air before the price is fixed.

The Vancouver permit path

The City of Vancouver Development and Building Services Centre issues the building permit. The city runs a Tenant Improvement Program for office tenants. Any commercial office building permitted after 31 January 2007 can sit on that list. The programme can remove a new development permit. It covers office work. A medical or dental clinic follows the standard building permit.

In a strata building the corporation approves hours and work on shared structure before the city sees the set. Coring a slab is a strata conversation and a structural conversation. It is not a note added after the permit.

Questions

Frequently asked.

Are you a tenant improvement contractor in Vancouver?

Yes. Oberizon Construction runs tenant improvements in Vancouver from a White Rock office. The City of Vancouver issues the building permit under the Vancouver Building By-law. Call (604) 385-3770.

Does Vancouver's Tenant Improvement Program cover a clinic?

No. It is an office programme for eligible buildings, including commercial office buildings permitted after 31 January 2007. A clinic uses the standard building permit.

Does Oberizon handle tenant improvement contractor in Vancouver?

Yes — we have delivered a project in Vancouver, including West Cordova residential build. We run tenant improvement contractor across the Lower Mainland from a White Rock head office.

Who issues the building permit for tenant improvement contractor in Vancouver?

The building permit is issued by City of Vancouver — Development and Building Services Centre, reviewed against the Vancouver Building By-law and the city's own zoning. Vancouver permits under its own Vancouver Building By-law rather than the BC Building Code and runs a Tenant Improvement Program for office tenants in eligible buildings. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does a tenant improvement cost in Vancouver?

The commercial renovation band is the pointer: $95–$180 per sq ft turnkey — typically $240k–$450k for a 2,500 sq ft space. A clinic fit-out is priced on its own page.. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Vancouver does Oberizon serve for tenant improvement contractor?

Most conversations start around Mount Pleasant, Kitsilano, and Cambie. We travel further when the scope justifies it.

What should I prepare before starting tenant improvement contractor in Vancouver?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Can Oberizon review my Vancouver space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning a tenant improvement in Vancouver?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770