Base-building condition
An older shell with tired mechanical, unlevel floors, or missing services adds cost before design decisions are even made. Site review picks this up early.
Services
Healthcare
Healthcare ConstructionDental Clinic ConstructionDental Office RenovationMedical Clinic ConstructionPharmacy ConstructionPhysiotherapy Clinic ConstructionChiropractic Clinic ConstructionOptometry Clinic ConstructionVeterinary Clinic ConstructionClinic Renovation ContractorDental clinic design-buildMedical clinic interior designDental millwork and cabinetryDental equipment and plumbingX-ray room shieldingOperatory plumbing and vacuumDental clinic permits in BCBuying or starting a practiceDental office floor plansClinic Launch IncentivesCommercial
Commercial ConstructionCommercial RenovationOffice Renovation ContractorTenant Improvement Contractor
2026 Cost Guide
Real 2026 cost ranges for healthcare, dental, medical, pharmacy, commercial, and luxury residential projects across White Rock and the Lower Mainland.
Estimate your build
Move the numbers and see a real range. No form, no email required to see the result.
Estimated build
$750,000–$1,125,000
$300–$450 per sq ft · driven by operatory count, suction runs and imaging shielding
Turnkey: design, permits, construction and site connections. Excludes land, clinical equipment purchase, and GST. A range is not a quote — the base-building condition sets where inside it you land. Published rate for this build type is $300–$450 per sq ft.
How to read this page
Every range below reflects current 2026 turnkey pricing across the Lower Mainland — design, permits, construction, and site connections included. Ranges move with base-building condition, service coordination, and finish level. Use them to budget before design starts, not after.
| Project type | Per sq ft | Typical total |
|---|---|---|
| Commercial Construction Driven by base-building condition and finish level. | $120–$220 / sq ft | $300,000 - $550,000 for a 2,500 sq ft space |
| Commercial Renovation Driven by the condition of what is already there. | $95–$180 / sq ft | $240,000 - $450,000 for a 2,500 sq ft space |
| Office Renovation Contractor Driven by layout, finishes and services. | $120–$220 / sq ft | $300,000 - $550,000 for a 2,500 sq ft space |
| Healthcare Construction Driven by service coordination and finish level. | $150–$320 / sq ft | $375,000 - $800,000 for a 2,500 sq ft space |
| Dental Clinic Construction Driven by operatory count, suction runs and imaging shielding. | $300–$450 / sq ft | $750,000 - $1,125,000 for a 2,500 sq ft space |
| Dental Office Renovation Driven by how much of the clinic stays open during the work. | $120–$260 / sq ft | $240,000 - $520,000 for a 2,000 sq ft space |
| Medical Clinic Construction Driven by exam room count and accessibility requirements. | $150–$260 / sq ft | $375,000 - $650,000 for a 2,500 sq ft space |
| Pharmacy Construction Driven by dispensary security and compounding-room compliance. | $180–$250 / sq ft | $270,000 - $375,000 for a 1,500 sq ft space |
| Physiotherapy Clinic Construction Driven by how much of the floor is open rehab versus enclosed treatment rooms. | $150–$320 / sq ft | $300,000 - $640,000 for a 2,000 sq ft space |
| Optometry Clinic Construction Driven by exam-lane count and dispensary millwork. | $150–$260 / sq ft | $300,000 - $520,000 for a 2,000 sq ft space |
| Clinic Renovation Contractor Driven by phasing around a practice that keeps operating. | $120–$240 / sq ft | $240,000 - $480,000 for a 2,000 sq ft space |
| Luxury Residential Construction Driven by finish level, millwork and site conditions. | $300–$400 / sq ft | $1,350,000 - $1,800,000 for a 4,500 sq ft space |
What moves the number
A range is only useful if you know which end of it your project sits on. These are the factors that move a healthcare or commercial project 20–40% inside the same square footage.
An older shell with tired mechanical, unlevel floors, or missing services adds cost before design decisions are even made. Site review picks this up early.
Dental compressors, vacuum lines, imaging, medical gas, and lab equipment need service locations planned before construction. Missed early = expensive later.
Complying pathway vs full building permit vs development permit changes both timeline and cost. Lower Mainland municipalities each have their own controls.
Millwork depth, stone selections, ceiling detail, custom lighting, and glazing systems can shift a project 25–40% at the same footprint.
A lease that starts before construction wraps forces trade sequencing choices that add cost. Realistic scheduling protects the budget.
Typical timeline
A realistic project schedule so lease dates, equipment orders, and opening plans line up with construction.
| Feasibility & review | 1 – 3 weeks |
|---|---|
| Design & selections | 6 – 12 weeks |
| Permits & tender | 6 – 16 weeks |
| Construction (2,500 sq ft clinic) | 10 – 16 weeks |
| Construction (4,500 sq ft luxury home) | 10 – 14 months |
| Deficiencies & handover | 1 – 3 weeks |
Frequently asked
A dental clinic in the Lower Mainland typically runs $300–$450 per square foot turnkey, or roughly $750,000–$1,125,000 for a 2,500 sq ft space. The final number depends on operatory count, equipment package, base building condition, and finish level. Oberizon completed a full 2,500 sq ft dental clinic in White Rock in 90 days end to end.
Commercial tenant improvements in Metro Vancouver typically range $120–$220 per square foot depending on layout complexity, finish level, and base-building condition. A 2,000–2,500 sq ft office fit-out is usually $240,000–$550,000.
Service and equipment coordination is the single largest variable. Compressed air, dental vacuum, medical gas, water treatment, and imaging equipment locations need to be locked before construction. Late equipment changes are the most expensive change orders in healthcare construction.
Fixed price gives cost certainty but transfers all risk to the contractor, which shows up in higher contingency. Cost-plus with a guaranteed maximum price is common on complex healthcare projects because it lets equipment and finish decisions evolve during construction without renegotiating the whole contract.
A typical 2,500 sq ft dental or medical clinic runs 10–16 weeks of construction after permits, plus 6–12 weeks of design and 6–16 weeks of permitting. Oberizon has delivered a fully functioning dental clinic in 90 days total when equipment and permits were pre-coordinated.
No. Every project is priced against the site, base-building condition, equipment package, and finish selections. The ranges on this page are 2026 Lower Mainland market indications so owners can budget realistically before design starts.
Next step
Get a real number for your specific project.
Send us the space, project type, and target timeline. We come back with a scoped estimate for your project — not a generic range.
Before you commit to a space, drawings, budget, or construction timeline, let Oberizon review the project and help you understand what needs to be planned before construction starts.