Pharmacy Construction in Richmond, BC

A pharmacy is a security and compounding problem wrapped inside a retail fit-out. Richmond is the one municipality in the region that publishes exactly what a commercial application has to contain before it will be accepted at all. That is useful, and it changes how we prepare a Richmond submission: the drawing set is assembled to their list first, because an incomplete package is not queued, it is refused.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Richmond runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner

Local planning

How it runs in Richmond.

Richmond will not accept an incomplete commercial application — its own guidance states that applications require all documentation and drawings listed on the form, and that incomplete applications will not be accepted. The commercial set has to include a site plan showing the whole building and the tenant location, a dimensioned floor plan with exits and fire separations, and a plumbing layout sized to the current BC Plumbing Code. Where exterior alterations are involved and the property sits in a development permit area, a Development Permit may be required before the building permit.

Richmond's commercial space runs from the Brighouse city centre through the Ironwood and Bridgeport business parks out to the older Steveston village stock, and the mix is unusually varied for one municipality. A large share of the medical and dental tenancy sits in mid-rise professional buildings around No. 3 Road, while the business parks carry the light-industrial and lab-adjacent work. Much of the city is built on delta soil, which is why structural changes get engineering attention earlier here than in most Lower Mainland municipalities.

BrighouseStevestonCambieIronwood

2026 range

$180–$250 per sq ft

turnkey — typically $270k–$375k for a 1,500 sq ft space

What that covers

  • Retail, dispensing, storage, and staff-area planning
  • Millwork, services, accessibility, and security coordination
  • Construction sequence and launch handover

What decides this build

A pharmacy is a secure area wrapped in a retail space. The dispensary boundary, sightlines and controlled-substance storage are fixed early, because they dictate where every wall can go.

The dispensary is laid out for sightlines and separation first — counter, consultation area and secure storage — and the millwork follows that. Where compounding is planned, the room is built to the USP 795 or USP 797 standard that applies, which cannot be retrofitted into a finished space.

Project review

We walk the space and price the risk before you commit to pharmacy construction. Permits and services are the two that bite.

Dispensary boundary

Sightlines, counter and secure storage are set first. Every other wall on the plan follows from them.

Compounding standard

Where compounding is planned the room is built to the applicable USP 795 or USP 797 requirements from drawing stage.

Questions

Frequently asked.

Does Oberizon handle pharmacy construction in Richmond?

Yes. We run pharmacy construction across the Lower Mainland from our White Rock head office, and that includes Richmond's commercial corridors and healthcare communities. Tell us the address and we will walk the space before you commit to anything.

Who issues the building permit for pharmacy construction in Richmond?

The building permit is issued by City of Richmond — Building Approvals, reviewed against the BC Building Code and the city's own zoning. Commercial applications are submitted through the MyPermit portal and are assessed against a published document checklist. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does pharmacy construction cost in Richmond?

$180–$250 per sq ft turnkey — typically $270k–$375k for a 1,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Richmond does Oberizon serve for pharmacy construction?

Most conversations start around Brighouse, Steveston, and Cambie. We travel further when the scope justifies it.

What should I prepare before starting pharmacy construction in Richmond?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

What has to be settled first in a pharmacy fit-out?

The dispensary boundary, sightlines and secure storage. Those decide where walls can go and where the millwork lands, so they are fixed before layout rather than adjusted around a finished plan.

What changes if the pharmacy will compound?

Compounding brings the applicable USP 795 or USP 797 requirements into the build — a dedicated room with its own ventilation and finishes. It cannot be retrofitted into a completed space, so it is decided before drawings.

Can Oberizon review my Richmond space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning pharmacy construction in Richmond?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.