Clinical space answers to CSA Z8000 and IPAC barriers, not standard commercial code alone. Richmond is the one municipality in the region that publishes exactly what a commercial application has to contain before it will be accepted at all. That is useful, and it changes how we prepare a Richmond submission: the drawing set is assembled to their list first, because an incomplete package is not queued, it is refused.

  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Richmond runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

Reviews

What clinic owners say.

Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner

Local planning

How it runs in Richmond.

Richmond will not accept an incomplete commercial application — its own guidance states that applications require all documentation and drawings listed on the form, and that incomplete applications will not be accepted. The commercial set has to include a site plan showing the whole building and the tenant location, a dimensioned floor plan with exits and fire separations, and a plumbing layout sized to the current BC Plumbing Code. Where exterior alterations are involved and the property sits in a development permit area, a Development Permit may be required before the building permit.

Richmond's commercial space runs from the Brighouse city centre through the Ironwood and Bridgeport business parks out to the older Steveston village stock, and the mix is unusually varied for one municipality. A large share of the medical and dental tenancy sits in mid-rise professional buildings around No. 3 Road, while the business parks carry the light-industrial and lab-adjacent work. Much of the city is built on delta soil, which is why structural changes get engineering attention earlier here than in most Lower Mainland municipalities.

BrighouseStevestonCambieIronwood

2026 range

$150–$320 per sq ft

turnkey — typically $375k–$800k for a 2,500 sq ft space

What that covers

  • Clinical layout and service coordination
  • Equipment, millwork, plumbing, and electrical planning
  • Inspection, deficiency, and handover management

What decides this build

Clinical space is reviewed twice — once by the municipality and once by the health authority — and the two ask for different things. Drawings that satisfy a building department can still come back from a clinical reviewer.

We produce the drawing set against CSA Z8000 expectations before it goes to the municipality, so the clinical reviewer and the building department are looking at the same package. Two review cycles run in parallel rather than one after the other.

Project review

We walk the space and price the risk before you commit to healthcare construction. Permits and services are the two that bite.

Two reviews, one package

The set is built to CSA Z8000 expectations so the health authority and the building department read the same drawings.

Infection control zoning

Clean and soiled routes are separated on the plan before a single wall is priced.

Questions

Frequently asked.

Does Oberizon handle healthcare construction in Richmond?

Yes. We run healthcare construction across the Lower Mainland from our White Rock head office, and that includes Richmond's commercial corridors and healthcare communities. Tell us the address and we will walk the space before you commit to anything.

Who issues the building permit for healthcare construction in Richmond?

The building permit is issued by City of Richmond — Building Approvals, reviewed against the BC Building Code and the city's own zoning. Commercial applications are submitted through the MyPermit portal and are assessed against a published document checklist. We confirm the current review window with the city at application rather than quoting one from a previous job.

How much does healthcare construction cost in Richmond?

$150–$320 per sq ft turnkey — typically $375k–$800k for a 2,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.

What areas near Richmond does Oberizon serve for healthcare construction?

Most conversations start around Brighouse, Steveston, and Cambie. We travel further when the scope justifies it.

What should I prepare before starting healthcare construction in Richmond?

The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.

Why does a clinical fit-out get reviewed twice?

The municipality reviews the building permit and the regional health authority reviews the clinical layout, and they assess different things. We prepare one package against CSA Z8000 expectations so both reviews can run in parallel instead of sequentially.

What does CSA Z8000 change about a clinic build?

It shapes infection control zoning, ventilation, clearances and finishes — coved base, sealed joints, cleanable surfaces. Applying it from the drawing stage avoids the redesign that follows a reviewer sending a package back.

Can Oberizon review my Richmond space before I commit?

Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.

Planning healthcare construction in Richmond?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.