A dental clinic is suction lines and plumbing long before it is finishes. Richmond is the one municipality in the region that publishes exactly what a commercial application has to contain before it will be accepted at all. That is useful, and it changes how we prepare a Richmond submission: the drawing set is assembled to their list first, because an incomplete package is not queued, it is refused.

(604) 385-3770
  • Building since 2021
  • Licensed & fully insured
  • 35+ delivered projects

Clinic launch incentives

Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.

See healthcare clinic construction

Experience

The same team, every build.

Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Richmond runs through the same four stages.

Building since 2021
5+yearsBuilding since 2021
Plus 5 in progress
35+deliveredPlus 5 in progress
Fastest clinic, five operatories
90daysFastest clinic, five operatories
The Shine Dental, White Rock, BC
Dental clinic · DeliveredThe Shine DentalWhite Rock, BC
  1. 01

    Review

    We walk the space and price the risk before you commit to anything.

  2. 02

    Plan

    Drawings and permits go in while equipment and long-lead items are ordered.

  3. 03

    Build

    One site lead holds the trades and calls you with progress every week.

  4. 04

    Handover

    Inspections cleared and the deficiency list closed before you take the keys.

The work

Builds we have delivered.

The Shine Dental, White Rock, BC
Dental clinicDelivered

The Shine Dental

White Rock, BC

Specialty
Dental clinic
Size
2,500 sq ft
Timeline
90 days end to end. Five operatories.
City permit authority
City of White Rock Building Division
  • Planning and permits
  • Five operatories mapped
  • Plumbing and electrical coordinated
  • Millwork measured
  • Equipment locations planned before handover
Read the case study

90 days end to end. Five operatories.

Dentists in Aldergrove, Unit 115, Aldergrove, BC
Dental clinicDelivered

Dentists in Aldergrove

Unit 115, Aldergrove, BC

Specialty
Dental clinic
Timeline
Completed June 2026.
  • Corridor with frosted-glass operatories
  • CBCT and X-ray room
  • Sterilization and lab millwork
  • Staff workstations
  • Reception and waiting area
Read the case study

Completed June 2026.

Marshall Road dental clinic, 104-33069 Marshall Road, Abbotsford, BC
Dental clinicDelivered

Marshall Road dental clinic

104-33069 Marshall Road, Abbotsford, BC

Specialty
Dental clinic
City permit authority
City of Abbotsford — Planning and Development Services
  • Dental clinic build-out
  • Delivered at 104-33069 Marshall Road

Reviews

What clinic owners say.

Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Dr. BradleyClinic Owner, Richmond
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
Dr. KanwarClinic Owner
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Dr. SatpreetClinic Owner

Local planning

How it runs in Richmond.

Richmond will not accept an incomplete commercial application — its own guidance states that applications require all documentation and drawings listed on the form, and that incomplete applications will not be accepted. The commercial set has to include a site plan showing the whole building and the tenant location, a dimensioned floor plan with exits and fire separations, and a plumbing layout sized to the current BC Plumbing Code. Where exterior alterations are involved and the property sits in a development permit area, a Development Permit may be required before the building permit.

Richmond's commercial space runs from the Brighouse city centre through the Ironwood and Bridgeport business parks out to the older Steveston village stock, and the mix is unusually varied for one municipality. A large share of the medical and dental tenancy sits in mid-rise professional buildings around No. 3 Road, while the business parks carry the light-industrial and lab-adjacent work. Much of the city is built on delta soil, which is why structural changes get engineering attention earlier here than in most Lower Mainland municipalities.

BrighouseStevestonCambieIronwood

2026 range

$300–$450 per sq ft

turnkey — typically $750k–$1.1M for a 2,500 sq ft space

What that covers

  • Operatory and sterilization coordination
  • Dental plumbing, electrical, equipment, and millwork planning
  • Inspection readiness and clean handover

What decides this build

Chair positions fix the plumbing. Once vacuum, air and drain are in the slab, moving an operatory is a concrete job, not a drawing revision.

Vacuum and compressed-air runs follow the chair layout, and the compressor and pump are sized for the final operatory count, not the opening one. A five-chair clinic plumbed for five cannot take a sixth without new trunk lines.

Project review

We walk the space and price the risk before you commit to dental clinic construction. Permits and services are the two that bite.

Chair-side services

Vacuum, air and drain run to each chair position, sized for the final operatory count rather than the opening one.

Sterilization flow

Dirty to clean runs one direction. The corridor is set before any millwork is ordered.

Where dentists lease in Richmond

Richmond's dental space splits into two markets that do not build the same way.

No. 3 Road and City Centre are mid-rise professional buildings. A large share of the medical and dental tenancy sits there, often in strata commercial floors above retail. Steveston is older village stock: smaller units, wood-frame or early commercial buildings, and plaza retail along the waterfront streets. Ironwood and Bridgeport are business-park buildings. They show up more often for lab-adjacent or light-industrial uses than for a street-front family practice.

A five-operatory clinic on No. 3 Road and a three-chair practice in a Steveston plaza can share a dentist and share nothing about the base building. One has a modern riser and a strata. The other has a limited panel and a landlord who has never hosted a compressor.

The permit path

The City of Richmond Building Approvals department takes commercial applications through the MyPermit portal. Richmond publishes the document list a commercial application must contain. The city's own guidance is that an incomplete package is not accepted. It is not placed in a queue to be completed later. That is why our Richmond drawing set is assembled to their list before it is uploaded.

The commercial set has to include a site plan of the whole building and the tenant's location, a dimensioned floor plan showing exits and fire separations, and a plumbing layout sized to the current BC Plumbing Code. Where the work changes the exterior and the property sits in a development permit area, a development permit can be required before the building permit.

Much of Richmond is on delta soil. Structural changes get engineering attention earlier here than in most Lower Mainland municipalities. A dental clinic that cores a slab or hangs a heavy imaging unit on an older Steveston floor should expect that engineering before the permit, not as a surprise at plan check.

Strata, plaza and medical-building leases

No. 3 Road medical buildings are usually strata. The corporation controls hours, the roof and the shared mechanical room. A dental compressor and vacuum pump need a home that is not a residential ceiling and not a corridor. Get that location into the lease, not into a change order.

Steveston plazas are landlord deals. The unit may be the right size on a plan and the wrong size once sterilization and a reception queue are drawn. Water service and electrical capacity are the two checks we make before advising you to sign.

Business-park units at Ironwood or Bridgeport can work for a specialist clinic that does not need street traffic. They are a weak choice for a family practice that depends on walk-by patients. The construction can succeed and the location can still be wrong. We will say so.

How Oberizon runs a dental design-build

There is no delivered Oberizon dental clinic recorded in Richmond. One family-dentist clinic in the portfolio has no city confirmed, and we will not assign it to Richmond to fill the gap. The photographed dental work is The Shine Dental in White Rock and Marshall Road in Abbotsford. Two dental clinics are in progress on 272 Street in Langley. Ask for those. They are the honest comparisons.

The sequence does not change because the city does. We want the lease, the chair count at maturity and a look at the shell before design is locked. Chair positions fix the plumbing. Vacuum, air and drain are rough-in, not finishes. The pump and compressor are sized for the final operatory count. Sterilization runs dirty to clean in one direction. Drawings are prepared with CSA Z8000 expectations so the building department is not the first person to see the clinical layout.

The BC College of Oral Health Professionals registers the dentist. Richmond issues the building permit. Those are separate approvals. A college registration does not open a construction site, and a building permit does not register a practice.

Bring the address to a consultation. We will tell you whether the suite can take the clinic, and what has to be planned before construction starts.

Where to go next

Also built in Richmond.

Commercial Contractors in RichmondPermits, delivered work and every service we run in Richmond.Dental office renovation in RichmondAn existing clinic rebuilt in phases. This page is the new build.Commercial ConstructionChoose this if you need to hire a commercial construction company with clear scope, budget, and schedule control.Commercial RenovationChoose this if you need to renovate an active or upcoming business space without losing control of schedule or cost.Office Renovation ContractorChoose this if you need to renovate or build an office that supports staff flow, client experience, and daily operation.Healthcare ConstructionChoose this if you need to build a healthcare space where services, permits, patient flow, and handover cannot be improvised.All service areasCompare how Oberizon works across the Lower Mainland.All Dental Clinic ConstructionSee the full service, pricing and every city we build it in.Estimate your buildSet your own square footage and see the range.Dental office build-outOne contract for the design and the construction.How to open a dental office in BCThe sequence from the site and the lease through the building permit.Dental Clinic Construction in VancouverKitsilano, Mount Pleasant, downtown and Kerrisdale under the Vancouver Building By-law. The West Cordova house is not a dental project.Dental Clinic Construction in BurnabyMetrotown, Brentwood and Lougheed podiums. A plan checker chooses fast track or full review.Dental Clinic Construction in CoquitlamTown Centre and Burquitlam podiums versus older Austin Heights and Maillardville units. A clinic that adds significant plumbing is outside the city's fast track.Dental Clinic Construction in North VancouverThe City covers Lower and Central Lonsdale and Marine Drive. The District covers Edgemont and Lynn Valley and requires an architect for most tenant improvements.Dental Clinic Construction in SurreySurrey reviews a clinic tenant improvement on its own stream, against a published target.Dental Clinic Construction in White RockThe Shine Dental in White Rock is a delivered clinic photographed on this site. The office is on Foster Street.Dental Clinic Construction in LangleyTwo dental clinics are in progress at #B115 and #E100, 8100 272 St, Langley.Dental Clinic Construction in AbbotsfordThe Marshall Road dental clinic at 104-33069 Marshall Road, Abbotsford is delivered and photographed.Medical clinic interior designExam rooms, reception, staff flow and finishes. Construction stays on the medical clinic page.Dental millwork and cabinetryReception desks, sterilization cabinetry and operatory casework on one page.Dental equipment and plumbingChair location drives the rough-in for vacuum, air and the drain.X-ray room shieldingShielding is drawn before the walls close.Operatory plumbing and vacuumVacuum, compressed air and a dedicated drain for each chair.Dental clinic permits in BCThe college registers the dentist. The municipality issues the building permit.Buying or starting a practiceA purchase may still need a renovation. A start is a shell.Dental office floor plansPlanning layouts for reception, sterilization, operatories and the mechanical room.

Questions

Frequently asked.

Where do dental clinics lease in Richmond?

No. 3 Road and City Centre are mid-rise medical buildings, often strata floors above retail. Steveston is older village and plaza stock. Ironwood and Bridgeport business parks suit a specialist clinic that does not need street traffic. They are a weak choice for a family practice that depends on walk-by patients.

What happens if a Richmond commercial permit application is incomplete?

It is not accepted. Richmond does not queue an incomplete package for later. Applications go through MyPermit and must include the published drawing set before a building permit file is opened.

Why does engineering show up early on a Richmond dental renovation?

Much of the city is on delta soil. Slab coring and a heavy imaging unit on an older Steveston floor need engineering before plan check, not after it.

Who permits a Richmond dental clinic?

The City of Richmond Building Approvals department issues the building permit. The BC College of Oral Health Professionals registers the dentist. The two approvals are separate.

Planning dental clinic construction in Richmond?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.