Healthcare ConstructionDental Clinic ConstructionDental Office RenovationMedical Clinic ConstructionPharmacy ConstructionPhysiotherapy Clinic ConstructionChiropractic Clinic ConstructionOptometry Clinic ConstructionVeterinary Clinic ConstructionClinic Renovation ContractorDental clinic design-buildMedical clinic interior designDental millwork and cabinetryDental equipment and plumbingX-ray room shieldingOperatory plumbing and vacuumDental clinic permits in BCBuying or starting a practiceDental office floor plansClinic Launch Incentives
Surrey Construction
Oberizon Construction builds physiotherapy and rehab clinics in Surrey from a White Rock office. Surrey's corridors are newer than the peninsula stock and the city publishes its own tenant-improvement streams. We confirm which stream a physiotherapy clinic uses before the drawings go in. There is no published Oberizon physiotherapy clinic in Surrey. A pharmacy on 156 Street is in progress. It is a pharmacy. It is not a physio clinic.
Clinic launch incentives
Opening or moving a clinic? Ask about complimentary preliminary plans, city coordination and up to $10,000 in construction credit for eligible healthcare projects.
Experience
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near Surrey runs through the same four stages.
We walk the space and price the risk before you commit to anything.
Drawings and permits go in while equipment and long-lead items are ordered.
One site lead holds the trades and calls you with progress every week.
Inspections cleared and the deficiency list closed before you take the keys.
The work
#1-2233 156 St, Surrey, BC
#111-10767 Whalley Blvd, Surrey, BC
Reviews
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Local planning
Surrey is the only municipality here that publishes a separate Medical Clinic Tenant Improvement permit, with its own three-week target. A clinic fit-out is not queued behind general commercial work. Fraser Health approval is required before the permit is issued where the space involves food handling, personal services or recreational services.
Surrey's commercial activity spreads across several distinct centres rather than one downtown — City Centre around Whalley and King George, Guildford, Fleetwood and Newton each carry their own professional and retail tenancy. Much of the healthcare space is in newer mixed-use and strata buildings, which usually means better base-building services than the older Fraser Valley stock but tighter strata rules about noise, hours and shared systems. The city has been adding population faster than almost anywhere in the province, and clinic demand has followed it into the suburban centres rather than staying downtown.
2026 range
$150–$320 per sq ft
turnkey — typically $300k–$640k for a 2,000 sq ft space
What that covers
What decides this build
The gym floor and the treatment rooms cannot share a wall if both are going to work. Circulation or storage has to sit between them. Ceiling height and structure are confirmed before the lease is firm.
Open rehab floor is the cheaper square footage. Enclosed treatment rooms are not. The published band is $150–$320 per sq ft and a mostly open clinic sits in the lower half of it.
We walk the space and price the risk before you commit to physiotherapy clinic construction. Permits and services are the two that bite.
The rehab floor stays open. Treatment rooms stay enclosed. The ratio of the two is what the price follows.
The gym and the treatment rooms are separated before the ceiling closes. Fixing that later means opening the walls.
The room program is the same one the physiotherapy guide describes. Treatment rooms. An open gym or rehab zone. Reception, storage and accessible circulation. The gym wants impact-rated flooring and height. The treatment rooms want cleanable finishes and quieter walls. One product rarely does both.
The published band is $150–$320 per sq ft, usually toward the lower half when most of the floor stays open. A 2,000 sq ft clinic is about $300,000–$640,000 for construction. Equipment is separate. The band is the Lower Mainland figure from the physiotherapy guide. It is not a Surrey quote.
The City of Surrey Building Division issues the building permit. Surrey publishes a Medical Clinic Tenant Improvement stream with its own target and a general new tenant improvement beside it. A physiotherapy clinic is not automatically that medical stream. We confirm the path with the city when the file is complete. The clock the city publishes starts on a complete application.
Where to go next
Questions
Yes. Oberizon Construction is a White Rock, BC general contractor and builds physiotherapy clinics in Surrey from that office. We confirm the City of Surrey permit stream before drawings are packaged. Call (604) 385-3770.
Yes — we have 2 projects in progress in Surrey right now, including 156 St pharmacy. We run physiotherapy clinic construction across the Lower Mainland from a White Rock head office.
The building permit is issued by City of Surrey — Building Division, reviewed against the BC Building Code and the city's own zoning. Surrey runs tenant improvements as their own permit stream and splits it three ways: minor, new and medical clinic. Review typically runs 3 business days for a minor tenant improvement and 3 weeks for a medical clinic fit-out against the city's own published targets.
$150–$320 per sq ft turnkey — typically $300k–$640k for a 2,000 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.
Most conversations start around City Centre, Guildford, and Fleetwood. We travel further when the scope justifies it.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Most physiotherapy build-outs run 3 to 5 months of construction once the building permit is issued. An open rehab floor is faster than the same area split into treatment rooms.
Treatment rooms and an open gym or rehab zone. Reception and storage. Acoustic separation between the noisy floor and the quiet rooms. Accessible circulation under the BC Building Code.
Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.
Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.