Oberizon Construction
Reception desk and timber slat wall at a completed family dentist clinic

Choosing a Contractor8 min read

CCDC 2 vs Cost-Plus vs Construction Management: Which Contract to Sign in BC

CCDC 2 is a fixed, stipulated price for a defined scope, so the contractor carries the cost risk. CCDC 3 is cost plus: you pay actual cost plus a fee, and you carry the cost risk. CCDC 5A and 5B are construction management contracts, where a manager runs the trades for a fee. The right form depends on how well the scope is defined when you sign.

Key takeaway. Choose the contract form by how complete your drawings are and how much cost risk you want to hold. A stipulated price (CCDC 2) suits a fully designed project. Cost plus (CCDC 3) suits work that cannot be defined up front. Construction management (CCDC 5A or 5B) suits larger or phased projects where you want a builder advising early and the trades priced in packages. The form numbers and descriptions here come from the Canadian Construction Documents Committee. This is general information, not legal advice.

The Contract Forms, Defined

The Canadian Construction Documents Committee (CCDC) publishes standard construction contracts used across Canada. These are the forms an owner is most likely to be offered on a commercial project:

There is also CCDC 14, the design-build stipulated price contract, where one party designs and builds. Whether to use design-build at all is a delivery-method decision rather than a contract-form decision. Our design-build vs general contracting guide covers that choice, and this post sticks to the contract forms.

Which Contract to Sign: A Decision Table

ContractWho carries cost riskHow you payBest project fit
CCDC 2, stipulated priceContractor, for the defined scope; owner, for changesOne fixed price, monthly progress drawsComplete drawings, clear scope, a tendered or negotiated fit-out
CCDC 3, cost plusOwnerActual cost plus a percentage or fixed feeScope that cannot be defined up front, such as renovation of an older building or urgent work
CCDC 5A, CM for servicesOwner, through the trade contracts it holdsFee to the construction manager, plus each trade contract directlyOwners with in-house project capacity who want to hold the trade contracts
CCDC 5B, CM for services and constructionOwner, unless a GMP or stipulated price is agreedActual cost plus a fee, with optional GMP or conversion to stipulated priceLarger or phased projects that need early builder input and staged pricing

The pattern is consistent. The less you know about the scope when you sign, the more cost risk you will carry, whatever the form says. A stipulated price on incomplete drawings does not remove that risk. It turns it into change orders.

CCDC 2: Stipulated Price

CCDC 2 is the default for a reason. You get one number for a defined scope, and the contractor carries the risk of its own costs, productivity and pricing on that scope. Bids are comparable because everyone priced the same drawings.

The limit is the word "defined". The fixed price covers the work shown in the contract documents. Anything added, changed or discovered goes through the change process, which in CCDC 2 runs through change orders and change directives. How allowances, contingencies and change directives behave under CCDC 2 – 2020 is covered in our guide to how contractors price a commercial project.

CCDC 2 fits best when the drawings are complete, the existing conditions are known, and you want price certainty more than flexibility. A clinic fit-out in a clean shell, with equipment selected and coordinated before tender, is the classic case.

CCDC 3: Cost Plus

Under CCDC 3 you pay what the work actually costs plus the contractor's fee, which is either a percentage of cost or a fixed amount. You gain flexibility and transparency. You can start before every detail is resolved, and you see the real costs. In exchange, you carry the risk that the total grows.

Cost plus suits work where a fixed price would mostly be guesswork, such as renovation of an older building where the conditions behind the walls are unknown. It also suits projects where the owner expects to make decisions as the work proceeds.

Protect yourself under cost plus by settling these points in the contract:

CCDC 5A and 5B: Construction Management

Construction management brings a builder in early to advise on cost, sequencing and buildability while the design is still developing. The trades are then priced in packages rather than all at once.

Under CCDC 5A, the construction manager provides services only. The CCDC describes the manager as a limited agent of the owner who administers the contracts between the owner and the trade contractors. You hold the trade contracts, often on CCDC 17, and with them the risk of coordinating them. This suits owners with their own project management capacity.

Under CCDC 5B, the construction manager advises in pre-construction and then performs the work. Pricing starts on an actual-cost-plus-fee basis. The parties can agree a guaranteed maximum price, a GMP with shared cost savings, or conversion into a stipulated price contract once the design is far enough along. That makes 5B a route from early involvement to a firm number.

Construction management adds a layer of fees and administration. It earns its keep on larger, phased or schedule-critical projects. On a single-suite fit-out with complete drawings, CCDC 2 is usually simpler.

What Changes in BC

The CCDC forms are national. Provincial law sits underneath them, and in BC the piece every owner meets is the holdback. Under BC's Builders Lien Act, the person primarily liable under a contract must retain 10% of the greater of the value of work or materials provided and the payments made under the contract. The holdback period generally runs 55 days after a certificate of completion is issued, or after the contract or improvement is completed if there is no certificate.

That obligation applies whatever form you sign. It shapes the payment schedule on every project: each progress payment is reduced by the holdback, and the holdback is released only after the period expires without liens being filed. Lien and payment legislation is amended from time to time, so confirm the current requirements with your lawyer before you rely on a payment schedule. Our BC Builders Lien Act guide walks through the holdback account, the deadlines and the steps owners take.

Most owners and contractors also modify standard CCDC forms with supplementary conditions. Read those as carefully as the form itself, because they are where the standard risk allocation gets changed.

Custom Homes and Smaller Projects

CCDC forms are written for the construction industry broadly and are most familiar on commercial and institutional work. On a custom home, you may instead be offered a builder's own fixed-price or cost-plus agreement. The same logic applies. A fixed price is only as firm as the drawings and allowances behind it, and cost plus needs clear reporting and an agreed approach to the fee. Our custom home building page explains how we approach those projects.

Conclusion

CCDC 2 gives a fixed price for a defined scope and suits a fully designed project. CCDC 3 trades price certainty for flexibility and suits work that cannot be defined up front. CCDC 5A and 5B bring a construction manager in early, with 5B offering a path to a guaranteed maximum or stipulated price. In BC, the Builders Lien Act holdback applies to all of them. Pick the form that matches how complete your drawings really are, read the supplementary conditions, and have a construction lawyer review the contract before you sign. If you are scoping a commercial project and want to talk through which form fits, see our commercial construction page.

Frequently asked questions

What is a CCDC 2 contract?

CCDC 2 is the Canadian Construction Documents Committee's Stipulated Price Contract, currently the 2020 edition. It is a standard prime contract between an owner and a general contractor to build a defined scope of work for a single fixed (lump sum) price, with monthly progress payments. The CCDC describes it as the industry standard prime contract.

What is the difference between CCDC 2 and CCDC 3?

CCDC 2 is a stipulated price contract: the contractor agrees to one fixed price for the defined work and carries the risk of its own costs running over. CCDC 3 (2016) is a cost plus contract: the owner pays the contractor's actual costs plus a percentage or fixed fee, so the owner carries the cost risk in exchange for flexibility when the scope is not yet fully defined.

Is a cost plus contract a bad idea for an owner?

Not inherently. A cost plus contract such as CCDC 3 suits work that cannot be fully defined at the outset, such as renovation of an older building where conditions are unknown. Its weakness is that the owner carries the cost risk. That is managed with a clear definition of reimbursable costs, open-book reporting, regular cost forecasts and, where the parties agree, a guaranteed maximum price.

What is the difference between CCDC 5A and CCDC 5B?

Both are construction management contracts. Under CCDC 5A the construction manager provides services only and acts as a limited agent of the owner, administering contracts between the owner and the trade contractors. Under CCDC 5B the construction manager advises during pre-construction and then performs the work, paid on an actual-cost basis plus a fee, with options for a guaranteed maximum price or conversion to a stipulated price.

Does the BC holdback apply to every contract type?

The holdback comes from BC's Builders Lien Act, not from the CCDC form, so it applies whether the contract is stipulated price, cost plus or construction management. The Act requires the person primarily liable under a contract to retain 10% of the value of work or materials provided, generally for 55 days after the contract is certified complete or otherwise completed. Confirm current requirements with your lawyer.

The service this article is about

Commercial spaces built around operations, access, finish quality, inspections, and business continuity.

Commercial Construction →

Related reading

Planning a build like this?

Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.

(604) 385-3770