Project review
We walk the space and price the risk before you commit to dental clinic construction. Permits and services are the two that bite.

West Vancouver Construction
A dental clinic is suction lines and plumbing long before it is finishes. We plan that before the site gets busy. Drawings, permits and trades are sequenced by one team out of White Rock.
Experience
Jas Oberoi has run Oberizon from its White Rock office since 2021. Work near West Vancouver runs through the same four stages.
We walk the space and price the risk before you commit to anything.
Drawings and permits go in while equipment and long-lead items are ordered.
One site lead holds the trades and calls you with progress every week.
Inspections cleared and the deficiency list closed before you take the keys.
Reviews
Very impressed with Oberizon Construction and the way they handled our dental clinic build. The team managed everything from planning to execution, and the final result was exactly what we envisioned.
We hired Oberizon to build out our dental clinic and they did an amazing job. The place looks so clean and modern, exactly the look we were going for.
Working with Oberizon on our dental clinic was a great experience from start to finish. Jas Oberoi and his team were professional, responsive, and genuinely invested in getting the details right.
Local planning
Oberizon works across the Lower Mainland, including West Vancouver and premium North Shore properties. Every project is planned around site access, inspection windows and how the finished space has to run.
West Vancouver work is shaped by luxury residential expectations, boutique healthcare spaces. We use that to set scope and sequence before demolition starts.
2026 range
$300–$450 per sq ft
turnkey — typically $750k–$1.1M for a 2,500 sq ft space
What that covers
What decides this build
Chair positions fix the plumbing. Once vacuum, air and drain are in the slab, moving an operatory is a concrete job, not a drawing revision.
Vacuum and compressed-air runs follow the chair layout, and the compressor and pump are sized for the final operatory count, not the opening one. A five-chair clinic plumbed for five cannot take a sixth without new trunk lines.
We walk the space and price the risk before you commit to dental clinic construction. Permits and services are the two that bite.
Vacuum, air and drain run to each chair position, sized for the final operatory count rather than the opening one.
Dirty to clean runs one direction. The corridor is set before any millwork is ordered.
Where to go next
Questions
Yes. We run dental clinic construction across the Lower Mainland from our White Rock head office, and that includes West Vancouver and premium North Shore properties. Tell us the address and we will walk the space before you commit to anything.
West Vancouver issues its own building permit, reviewed against the BC Building Code and the city's zoning bylaw, and the route differs from neighbouring municipalities. We confirm the current requirements with the city at the start of every job rather than working from the last one.
$300–$450 per sq ft turnkey — typically $750k–$1.1M for a 2,500 sq ft space. Base-building condition and finish level move that number most. The full 2026 breakdown is in the cost guide at /cost.
Most conversations start around Dundarave, Ambleside, and Park Royal. We travel further when the scope justifies it.
The address, your lease stage and a target opening date. Drawings and a budget range help. The more we know early, the tighter the feasibility comes back.
Each chair needs its own vacuum line, compressed-air line and dedicated drain, and those run in or under the slab. Moving an operatory after the rough-in is concrete work, not a drawing revision.
Size for the final operatory count, not the opening one. A clinic plumbed for five chairs cannot take a sixth without new trunk lines, and the cost difference at rough-in stage is far smaller than the retrofit.
Yes. A review finds the permit and service risks before you sign a lease or a design. That is the cheapest point to find them — a change after drawings are sealed costs weeks, not hours.
Before you commit to a space, drawings, a budget, or a construction timeline, book a consultation and we will tell you what has to be planned before construction starts.